Advertisement

News

about 6 years ago

Royal IHC and the McDermott’s AMAZON project

Royal IHC is modifying McDermott’s pipelay and construction vessel AMAZON. It includes the delivery of an innovative and complete J-lay system. IHC manages the whole modification of this project, from the design through to the integration of the new equipment. The physical modifications comprise the

1 minutes read
Royal IHC and the McDermott’s AMAZON project
Royal IHC

Royal IHC is modifying McDermott’s pipelay and construction vessel AMAZON. It includes the delivery of an innovative and complete J-lay system.

IHC manages the whole modification of this project, from the design through to the integration of the new equipment. The physical modifications comprise the removal of the existing pipelay system and its replacement with a new J-lay system with a top dynamic capacity of 1,500 tonnes.

The J-lay system will be able to handle every variety of pipe including normal flowlines, export lines, and various pipe-in-pipe configurations, ranging in size from 4.5 to 24 inches with wall thicknesses approaching 2 inches.

Watch the Showcase and learn more about this construction project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.