Advertisement

Fossil Energy

about 12 years ago

Statoil: Damaged pipe shuts down Troll C production

Statoil has shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system. The corroded pipe will be replaced. This is expected to require a 7-day shutdown. Troll

1 minutes read

Statoil has shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system.

The corroded pipe will be replaced. This is expected to require a 7-day shutdown.

Troll C has a daily equity production of some 58 000 barrels of oil , and exports 8 million cubic metres of gas. In addition, some 34 000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.