Advertisement

Fossil Energy

about 12 years ago

Statoil to set up modular drilling rig on Heimdal

Statoil has received consent for installation and temporary operation of a modular drilling rig (MDR) at the Heimdal facility. Installation will begin in the third quarter of 2014 with commissioning scheduled for November. Heimdal is a gas field lying under 120 metres of water in block 25/4 in the c

1 minutes read

Statoil has received consent for installation and temporary operation of a modular drilling rig (MDR) at the Heimdal facility.

Installation will begin in the third quarter of 2014 with commissioning scheduled for November.

Heimdal is a gas field lying under 120 metres of water in block 25/4 in the central North Sea. The field has been developed using an integrated production, drilling and accommodation facility with a steel jacket.

Heimdal currently comprises two main facilities, Heimdal Main Platform (HMP) and Heimdal Riser Platform (HRP), and operates as a gas node in the North Sea under the designation Heimdal Gas Centre (HGS).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.