TechnipFMC bags EPCI job on Petrobras Mero field
TechnipFMC has been awarded by Petrobras a large engineering, procurement, construction and installation contract for the Mero 1 pre-salt field, located in the Santos Basin, at 2,100 meters of water depth offshore Brazil.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed