Advertisement

Equipment

Important Milestone for 2H Offshore
Equipment

Important Milestone for 2H Offshore

2H Offshore, an Acteon company, has joined an international European consortium comprising nineteen leading industry and research organisations to develop deepwater mining solutions. Over the next four years, the European Commission funded project, known as Blue Mining, will be developing seabed min

about 12 years ago
Industry Majors Team Up to Develop Next Generation Subsea Production Equipment
Equipment

Industry Majors Team Up to Develop Next Generation Subsea Production Equipment

FMC Technologies, Inc. announced that it has signed an agreement which establishes a joint industry program that includes Anadarko Petroleum Corporation, BP, ConocoPhillips and Shell for the purpose of jointly developing a new generation of standardized subsea production equipment and systems design

about 12 years ago
Slovenia: Koper Dredging Project in Full Swing
Equipment

Slovenia: Koper Dredging Project in Full Swing

The Port of Koper dredging scheme is moving forward. The second, larger dredger, owned by the Netherlands-based contractor Van Oord, yesterday commenced dredging works aimed at the seabed deepening along the Container Terminal to 14 metres. By the end of August, the trailing suction hopper dredger D

about 12 years ago
Statoil Resumes Production on Njord A
Equipment

Statoil Resumes Production on Njord A

Statoil resumed oil and gas production on the Njord A platform in the Norwegian Sea on 19 July, after a major reinforcement of the platform structure. Production has been shut down since last summer. Extensive analyses and inspections in 2013 revealed a need to reinforce the Njord A platform structu

about 12 years ago
Kleven signs shipbuilding contract with IES Pioneer
Equipment

Kleven signs shipbuilding contract with IES Pioneer

Kleven has signed a new shipbuilding contract with Malaysian based Joint Venture Company IES Pioneer Ltd. The contract for the new vessel is of the MT 6015 MPSV design, designed by Norwegian design company MarinTeknikk, and will be outfitted with a crane, helideck and FiFi II. Delivery will be in Se

about 12 years ago

Advertisement

Det norske: Gohta-2 well confirms oil and gas presence (Norway)
Equipment

Det norske: Gohta-2 well confirms oil and gas presence (Norway)

Det norske oljeselskap ASA has announced that the Gohta-2 appraisal well in PL492 is about to be completed. The well confirmed presence of oil and gas and two production tests were undertaken. The test of the gas zone was successful, whereas the test in the oil zone was inconclusive. The appraisal w

about 12 years ago
Plexus wins equipment delivery for Centrica (UK)
Equipment

Plexus wins equipment delivery for Centrica (UK)

Plexus Holdings PLC, has received an additional purchase order from Centrica Energy Exploration and Production to supply surface wellhead and mudline equipment services for an exploration well in the Southern North Sea, Offshore UK. The value of the order is estimated at approximately $1 million (£6

about 12 years ago
Plexus Bags Additional Order from Centrica
Equipment

Plexus Bags Additional Order from Centrica

Plexus Holdings PLC, the owner of the proprietary POS-GRIP® friction-grip method of wellhead engineering, has received an additional purchase order from Centrica Energy Exploration and Production (‘Centrica’) to supply surface wellhead and mudline equipment services for an exploration well in the So

about 12 years ago
Top News – July 14 to 20, 2014
Equipment

Top News – July 14 to 20, 2014

Boskalis Consortium Bags Singapore Port Expansion Contract Royal Boskalis Westminster N.V. (Boskalis) has in consortium been awarded work associated with the expansion of the Singapore Tuas Mega Port development. Experts Doubt Panama Canal Expansion Will Be “Game Changer” The expansion of the Pana

about 12 years ago
PSA reviews pressure drilling on COSL Innovator
Equipment

PSA reviews pressure drilling on COSL Innovator

From 10 to 13 June 2014, the Petroleum Safety Authority Norway carried out an audit of Statoil’s use of managed pressure drilling using COSL Innovator on the Troll field. The objective of the activity was to audit that Statoil, the service providers, drilling contractor and other stakeholders, were

about 12 years ago

Advertisement

Statoil’s MDR monitoring on Heimdal needs improvement
Equipment

Statoil’s MDR monitoring on Heimdal needs improvement

From 24 March to 18 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s monitoring of major-accident and OHAS risk associated with a modular drilling rig (MDR) in temporary use for well plugging at the Heimdal facility. The objective of the activity was to audit

about 12 years ago
Loggers Noise Solutions for World’s Largest Dredgers
Equipment

Loggers Noise Solutions for World’s Largest Dredgers

During its 91st session in November 2012, IMO’s Maritime Safety Committee (MSC) adopted a number of amendments to the International Convention for the Safety of Life at Sea (SOLAS). Among these amendments was the adoption of the new SOLAS regulation II-1/3-12, which requires ships to be constructed

about 12 years ago
Veessen-Wapenveld Channel: Scale Model Tests Underway
Equipment

Veessen-Wapenveld Channel: Scale Model Tests Underway

To protect Deventer, Zutphen and the villages on the IJssel River from extreme high water and flooding, an eight-kilometre-long channel is being created between Veessen and Wapenveld. Work will start after the summer on the channel, which can take a maximum of 45% of the water from the IJssel. Scale

about 12 years ago
Engineering of Aasta Hansteen platform subject of PSA inspection
Equipment

Engineering of Aasta Hansteen platform subject of PSA inspection

From 3 to 25 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s engineering of the Aasta Hansteen spar platform. The objective of the audit was to assess whether Statoil’s and the contractors’ management of detail engineering in the area of OHAS was being carrie

about 12 years ago