In the presence of Lower Saxony’s State Premier Stephan Weil, DONG Energy and Nexans Deutschland on Monday signed a supplementary contract for the delivery and installation of medium-voltage cables for the German offshore wind farms Gode Wind 1 and 2. This new agreement is part of an outline contrac
2G Robotics underwater laser scanning systems are being widely used to understand pipeline damage due to anchor drags. From the Middle East to the North Sea and the Gulf of Mexico, damage due to anchor drags is relatively common, and certainly a situation requiring further investigation. 2G Robotics
In a deep sea environment, the consequences of poor communication can be life-threatening. Technical divers working in the offshore oil and gas industry need to communicate clearly with the diving bell, vessel and each other as they carry out maintenance and inspections up to several hundred metres
Ackermans & van Haaren NV has announced its “Redemption on Shares” regular update. They have concluded a liquidity contract with Kepler Cheuvreux to improve the liquidity of the AvH-share. In the framework of this liquidity programme, Kepler Cheuvreux has in the period from January 27, 2014 until Fe
Offshore drilling contractor North Atlantic Drilling has agreed to purchase two next-generation GE Oil & Gas SeaONYXTM blowout preventer (BOP) control systems, upgrading control spreads on board NAD’s semi-submersible West Venture and drill ship West Navigator. The SeaONYX BOP control system exten
SBG Systems releases the Ekinox Subsea Series at SUBSEA EXPO (UK). Ekinox Subsea Series is a product family of survey-grade inertial systems designed for underwater applications – up to 6,000m. The series includes the Ekinox-M, a Motion Reference Unit (MRU), and the Ekinox-U, an underwater Inertial
Subsea specialist ROVOP has expanded its fleet of remotely operated vehicles (ROVs) by taking delivery of four new hydraulic work class systems with a further four new ROVs expected later in the year. The company has invested $20million (over £12 million) in the four hydraulic Schilling HD work clas
Subsea specialist ROVOP has expanded its fleet of remotely operated vehicles (ROVs) by taking delivery of four new hydraulic work class systems with a further four new ROVs expected later in the year. The company has invested $20million (over £12 million) in the four hydraulic Schilling HD work clas
A new name in advanced subsea equipment supply is being unveiled at Subsea Expo on Wednesday 5th of February 2014. Great Yarmouth-based Sonar Equipment Services will now trade under the name of Subsea Technology & Rentals (STR) to better reflect the broader range of products and associated services
MP Steve Barclay has called on the Environment Agency to increase its dredging of the Old Bedford River and demonstrate that the lessons of the Somerset floods are being applied in the Fens. “At present the Environment Agency are dredging some parts of the Old Bedford River but not all the areas rec
Australia: Walker Shoal Dredging Completed, INPEX Says The most technically challenging phase of the Darwin Harbour dredging program is wrapped up, INPEX announced. CHEC Nabs Ras Al-Khair Port Dredging Contract (Saudi Arabia) On January 15, CHEC won the bid for Phase 4 of extension of Ras Al-Khair
Nautronix has delivered the first two NASDrill RS925 and NASeBOP (Emergency BOP Acoustic Control) systems from their current order of four systems for two of Rowan’s new ultra-deepwater drillships, the Rowan Relentless and the Rowan Reliance. The total contract value is worth approximately $10 milli
A Hydrex diver/technician team mobilized to St. Malo, France, in January to perform an emergency repair operation on a 132-meter dry cargo vessel. When the rudder of the vessel was severely damaged during a heavy storm it came loose and was swinging dangerously from side to side during sailing, hitt
The Port of Wells dredging project is scheduled for 3rd February, 2014. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 4 and 2. All material dredged from these areas will be placed on the berm which is marked by the por