During the EAGE in Copenhagen the WGP Group signed a new joint venture (JV) agreement with P-Cable 3D Seismic AS (“P-Cable”) for the commercialisation of new, patented High Resolution 3D seismic technology; the joint venture will trade as WGP Survey Ltd. The benefits of P-Cable’s new technology incl
JDR Cable Systems has won its first ever offshore wind farm export wire supply contract. Danish developer Dong has selected the subsea inter-array specialist to manufacture a 12km medium-voltage link for the two-turbine Gunfleet Sands demonstrator. The cable is being produced in JDR’s Hartlepool fac
Centrica Renewables Energy Ltd. has confirmed that Global Marine Energy Ltd., the largest independent provider of subsea power cable installation, maintenance and related engineering services worldwide, has successfully completed its portion of the cable landing and near shore cable works related to
During the EAGE in Copenhagen the WGP Group signed a new joint venture (JV) agreement with P-Cable 3D Seismic AS (“P-Cable”) for the commercialisation of new, patented High Resolution 3D seismic technology; the joint venture will trade as WGP Survey Ltd. The benefits of P-Cable’s new technology incl
QinetiQ, who lead the world in the provision of Submarine Escape, Rescue, Abandonment & Survival (SMERAS) Support Services and Diving & Life Support Services, has re-commissioned its Hyperbaric Trials Unit (HTU) following an extensive refit. The HTU joins an array of specialist equipment that forms
Intertek’s Energy and Water consultancy services (formerly Intertek METOC), has launched a cable optimisation service to support planning and operation of array, export and interconnector cables. The unique modelling service will enable developers and utilities to save time and cost during array cab
Subsea UK reports that Tyne and Wear Marine (TWM) Ltd., a marine and engineering company, used Tritech’s StarFish 990F for the dock wall survey on the Tyne River, Newcastle. The technology was used during port survey and inspection project, and has the latest in advanced CHIRP (Compressed High Inten
APM Terminals Maasvlakte II has selected Cargotec as the quay crane supplier for the company’s future Maasvlakte II terminal in Rotterdam. The decision reflects a comprehensive bidding process designed to find cranes that offered the highest safety, productivity and automation standards required for
Subsea UK reports that Tyne and Wear Marine (TWM) Ltd., a marine and engineering company, used Tritech’s StarFish 990F for the dock wall survey on the Tyne River, Newcastle. The technology was used during port survey and inspection project, and has the latest in advanced CHIRP (Compressed High Inten
Offshore handling equipment specialist, Caley Ocean Systems is taking part in a Joint Industry Project (JIP) into the Requirements for Certification of fibre rope-based, Deepwater Installation Systems that will ultimately be incorporated in a new standard for Offshore Deployment and Recovery Systems
There are great things happening aboard the vessel “Havila Phoenix” nowadays. During the last two years there have been installations and tests of a whole new system likely to revolutionise the offshore light well intervention market. The vessel, a Havyard 858 design, is designed and constructed by
Odyssey Marine Exploration, pioneers in the field of deep-ocean exploration, announced it has executed a contract with JBR Recovery Limited to support the logistics, refining and monetization of the anticipated silver cargoes from SS Gairsoppa and SS Mantola when recovered. Both the Gairsoppa and Ma
CSL, the Aberdeen-headquartered project management and engineering company is currently supporting Endeavour Energy UK Limited (Endeavour) as preferred supplier for the provision of Offshore Company Representation in support of the Subsea Facilities Offshore Installation for the Rochelle Development
WGP Exploration announces two contract awards with TGS-Nopec for the provision of marine gravity equipment for their on-going multi-client projects in the North Sea. The projects, which commenced in late May, have an anticipated duration of six weeks and two months respectively. Complimenting marine