The newly developed electric drive rope winch by ZOLLERN is employed for the first time as part of a highly sophisticated mobile drilling system used to drill down to a depth of 5 kilometres for gas resources. For the first time, ZOLLERN uses an asynchronous motor developed inhouse and specially des
On 30 May 2012, IHC Merwede signed an agreement to acquire Wave Rotor technology from Ecofys, which is renowned for its expertise in sustainable energy solutions. The official signing was made by Willem Steenge, Managing Director of IHC Tidal Energy, and Manon Janssen, Managing Director of Ecofys. W
SeaPro Nav, Sercel’s integrated navigation system for all in-water seismic equipment, has been selected by SeaBird Exploration as the master system for two vessels in its marine seismic fleet, the Harrier Explorer and the Aquila Explorer. SeaBird Exploration is the fourth industry player to choose S
SeaPro Nav, Sercel’s integrated navigation system for all in-water seismic equipment, has been selected by Cyprus-based Seabird Exploration as the master system for two vessels in its marine seismic fleet, the Harrier Explorer and the Aquila Explorer. Seabird Exploration is the fourth industry playe
Prysmian Group, world leader in the energy and telecom cable systems industry, inaugurates its new submarine cable plant in Finland, having invested approximately €40 million to increase its production capacity at the Pikkala facility, already one of the Group’s centres of excellence for high voltag
Norway’s TTS Group ASA today announced it has finalized its sale of the drilling equipment business to Cameron International Corporation for USD 270 million, plus a turnover based earn-out model for a three-year period. CEO & President of TTS Group, Johannes D. Neteland said: “This divestment is an
Paradigm™ announced yesterday that after a competitive evaluation, Cairn Energy PLC has chosen the Paradigm interpretation toolkit as its next generation 2D and 3D seismic interpretation solution. Cairn will use the new system to interpret new 3D surveys acquired last year in offshore Greenland. The
Schlumberger today announces the launch of IsoMetrix marine isometric seismic technology and the IsoMetrix family of marine seismic products. This breakthrough technology outputs isometrically sampled point-receiver data in both crossline and inline directions—capturing the returning wavefield in th
Schlumberger announces the launch of IsoMetrix marine isometric seismic technology and the IsoMetrix family of marine seismic products. This breakthrough technology outputs isometrically sampled point-receiver data in both crossline and inline directions—capturing the returning wavefield in three di
Sercel announced the expansion of its marine seismic equipment offering with the launch of the Sentinel® RD, the latest generation of its Sentinel solid streamer. With over 4,000 km of streamers delivered to more than 60 seismic vessels worldwide since its introduction in 2005, Sentinel has become t
Sercel announced today the expansion of its marine seismic equipment offering with the launch of the Sentinel® RD, the latest generation of its Sentinel solid streamer. With over 4,000 km of streamers delivered to more than 60 seismic vessels worldwide since its introduction in 2005, Sentinel has be
MPM has been awarded the contract for subsea wetgas meters for the Åsgard Subsea Compression by Aker Solutions. The meters will be installed upstream each compressor train, as part of Aker Solution’s retrievable cooler module. The Åsgard field lies in 250 – 300 m water depth in the Norwegian Sea, ab
MPM has been awarded the contract for subsea wetgas meters for the Åsgard Subsea Compression by Aker Solutions. The meters will be installed upstream each compressor train, as part of Aker Solution’s retrievable cooler module. The Åsgard field lies in 250 – 300 m water depth in the Norwegian Sea, ab
Research ship Yantar on May 31 left covered workshop of JSC Yantar Shipyard and was moved to open slipway, reports the shipyard’s press service. Although moving of the 2,000-ton hull took less than an hour, it needed thorough preparation. As a result, the hull was placed at a pre-launch position to