Advertisement

Fossil Energy

First Steel Cut for ‘Ceona Amazon’ Vessel (Poland)
Fossil Energy

First Steel Cut for ‘Ceona Amazon’ Vessel (Poland)

The first steel – cutting taking place in CRIST shipyard in Gdynia, Poland and marks the start for Lloyd Werft Bremerhaven AG for the construction of the new large, multifunction, dynamic positioned construction for London-based CEONA. Her keel will be laid already in August also at the CRIST Shipya

about 13 years ago
Acteon Buys J2 Engineering Services (UK)
Fossil Energy

Acteon Buys J2 Engineering Services (UK)

Acteon has completed the acquisition of J2 Engineering Services Ltd, which is based in Aberdeen, UK. J2 Engineering is involved in the rental, maintenance and repair of ROV manipulator arms and associated tooling and equipment. Over the past five years, the company has forged a reputation within the

about 13 years ago
Wagenborg: ‘Walk-to-Work’ Vessel for Dutch North Sea
Fossil Energy

Wagenborg: ‘Walk-to-Work’ Vessel for Dutch North Sea

NAM, the Dutch national gas company, has selected Wagenborg to support offshore operations for a period of 10 years. Wagenborg has commissioned Niestern Sander from Delfzijl to build a ship: the ‘’Walk-to-Work’’ Vessel. Wagenborg has described the ship as a ” truly unique vessel that will play a cru

about 13 years ago
Petroceltic Successfully Bids for Patraikos Block Off Greece
Fossil Energy

Petroceltic Successfully Bids for Patraikos Block Off Greece

Petroceltic International plc, an oil and gas exploration and production company focused on North Africa, the Mediterranean and Black Sea regions, has announced that a consortium comprising Petroceltic, Hellenic Petroleum S.A.(Operator) and Edison International SpA has submitted a successful bid for

about 13 years ago
Statoil Awards FSU Mooring Job to Ezra
Fossil Energy

Statoil Awards FSU Mooring Job to Ezra

EMAS AMC, the Subsea Services division of Ezra Holdings Limited, announced today that it has been awarded a transport and floater installation contract for two FSUs, with an option for a third, from Statoil for their Heidrun and Mariner fields, offshore Norway. The contract is valued at approximatel

about 13 years ago

Advertisement

Gallery: Vard Brevik Hands Over New PSV to Island Offshore
Fossil Energy

Gallery: Vard Brevik Hands Over New PSV to Island Offshore

At 13.30 hrs today Island Offshore took delivery of the M/V Island Duke from Vard Brevik. This vessel is the first in a series of four PSV vessels with UT717 CD design to be delivered from Vard Brevik in 2013 and 2014. The vessels’ DW is 3,800 tons and a with an 800 m2 cargo […]

about 13 years ago
Statoil Receives Clearance to Use ‘Borgland Dolphin’ at Vega Sør
Fossil Energy

Statoil Receives Clearance to Use ‘Borgland Dolphin’ at Vega Sør

Statoil Petroleum AS (Statoil) has received consent to use the Borgland Dolphin semi-submersible drilling rig for plugging and facilitation of sidetrack drilling at well 35/11-R-12 H Vega Sør. Well 35/11-R-12 H Vega Sør is part of production licence 090C in the northern part of the North Sea, and is

about 13 years ago
Polish Yard to Build Its First OSVs Powered by LNG
Fossil Energy

Polish Yard to Build Its First OSVs Powered by LNG

Polish shipyard Remontowa Shipbuilding has received an order to construct two offshore support vessels for, what they described as, “one of the biggest Norwegian offshore fleet owners.” The yard said in a statement that the value of the order was approximately 100 million euro, and that the vessels

about 13 years ago
LUKOIL Assembles Supporting Blocks for Caspian Sea Platform
Fossil Energy

LUKOIL Assembles Supporting Blocks for Caspian Sea Platform

LUKOIL has launched assembly of supporting blocks for the ice-resistant stationary platform located at Vladimir Filanovsky field in the Caspian Sea. The supporting blocks will be attached to the seabed by means of twenty piles, each with a diameter of more than 2 meters. The piles will be hammered i

about 13 years ago
Premier, KUFPEC Acquire Interest in Bream Field (Norway)
Fossil Energy

Premier, KUFPEC Acquire Interest in Bream Field (Norway)

Premier Oil has announced that, in conjunction with KUFPEC Norway AS (KUFPEC), it has agreed to acquire a 40 per cent interest in PL407 from BG Norge AS (BG). PL407 contains the Bream field and is on the Norwegian Continental Shelf. KUFPEC will acquire a 30 per cent interest while Premier will incre

about 13 years ago

Advertisement

Delivery Date Confirmed for ‘Cecon Pride’ OCV
Fossil Energy

Delivery Date Confirmed for ‘Cecon Pride’ OCV

Cecon has announced that that the ramp-up and progress at Chantier Davie Canada Inc. for completion of Cecon’s first of three SURF sister vessels is now well underway. The yard has confirmed delivery of the first vessel “Cecon Pride” to take place during week 8/2014 as per the contract. The sea tria

about 13 years ago
Bridge Energy Hires ‘Blackford Dolphin’ Semi (UK)
Fossil Energy

Bridge Energy Hires ‘Blackford Dolphin’ Semi (UK)

Bridge, the Oslo Børs and AIM listed oil and gas exploration and production company, has announced that, along with its partners in the Licence, it has entered into a contract with Dolphin Drilling Limited to secure a drilling slot with the Blackford Dolphin semi-submersible rig. This rig will targe

about 13 years ago
Statoil Spuds ‘Cliffhanger’ Well in North Sea (Norway)
Fossil Energy

Statoil Spuds ‘Cliffhanger’ Well in North Sea (Norway)

Statoil has kicked off drilling of exploration well 16/2-18S in PL265, west of Johan Sverdrup field, in the Norwegian part of the North Sea. The well will target the Cliffhanger North prospect, located in the North Sea sector of the Norwegian Continental Shelf (NCS). The well is located in PL265 wes

about 13 years ago
EMGS Reveals PEMEX as 3D EM Contract Client
Fossil Energy

EMGS Reveals PEMEX as 3D EM Contract Client

With reference to the announcement dated 27 June 2013 and titled “EMGS awarded major 3D EM contract”, Electromagnetic Geoservices ASA (EMGS) has today signed a contract worth USD 99.8 million with Mexic0’s PEMEX, one of the world’s largest national oil companies. “PEMEX has truly realised and taken

about 13 years ago