Advertisement

Fossil Energy

Wartsila to Design Six Offshore Support Vessels for COSL
Fossil Energy

Wartsila to Design Six Offshore Support Vessels for COSL

Wärtsilä, the marine industry’s leading solutions and services provider, has signed a contract with China Oilfield Services Ltd (COSL) to supply the designs for a total of six new ships. The two Platform Supply Vessels (PSVs) and four Anchor Handling Tug Supply (AHTS) vessels will initially provide

about 14 years ago
Danish Technology to Improve Offshore Oil Recovery
Fossil Energy

Danish Technology to Improve Offshore Oil Recovery

The Danish National Advanced Technology Foundation has announced its subsidy to a project headed by Aalborg University endorsed by Maersk Oil and Ramboll Oil & Gas. The purpose of the project is to heighten production efficiency and increase oil recovery offshore. At the same time, the project will

about 14 years ago
TAP Gets More Time for ESIA Submission (Italy)
Fossil Energy

TAP Gets More Time for ESIA Submission (Italy)

TAP has agreed with the Italian Ministry of Environment to extend the suspension of its Environmental & Social Impact Assessment (ESIA) application in Italy for an additional nine months – until September 2013. As part of its commitment to an open and transparent ESIA disclosure process, TAP launche

about 14 years ago
Scarabeo 8 Tilting: PSA Norway Discovers Serious Breaches of Regulations
Fossil Energy

Scarabeo 8 Tilting: PSA Norway Discovers Serious Breaches of Regulations

The Petroleum Safety Authority Norway (PSA) has issued Saipem SpA Norwegian Branch (Saipem) a notification of order following investigation of the stability incident on the semi-submersible “Scarabeo 8” drilling rig on 4 September 2012. The investigation proved serious breaches of the regulations. O

about 14 years ago
PSA: Damage to Anchor Bolsters Found on Floatel Superior
Fossil Energy

PSA: Damage to Anchor Bolsters Found on Floatel Superior

Information about damage to anchor bolsters which could be significant for other mobile units has emerged from the PSA’s investigation of a stability incident affecting the Floatel Superior mobile accommodation unit on 7 November. The PSA has notified the industry of this. The following alert has be

about 14 years ago

Advertisement

PSA Inspects NAD’s Management of West Alpha Systems
Fossil Energy

PSA Inspects NAD’s Management of West Alpha Systems

During the period 29 October – 2 November 2012, the Petroleum Safety Authority Norway (PSA) carried out an audit of North Atlantic Drilling’s (NAD’s) management of major accident risk and barrier handling system on West Alpha. The objective of the activity was to evaluate the company’s understanding

about 14 years ago
SeaBird, Searcher Seismic in Joint Barents Sea Survey
Fossil Energy

SeaBird, Searcher Seismic in Joint Barents Sea Survey

SeaBird Exploration Plc (“SeaBird”) has partnered with Searcher Seismic Pty Ltd (“Searcher Seismic”) on the multi-client 12,000 km Snøspurv 2D high resolution seismic survey covering the Bjarmeland Platform in the Norwegian Barents Sea. The survey is scheduled to commence in Q2 2013 and is estimated

about 14 years ago
NPD: Twelve Discoveries Made in Norway in 2012
Fossil Energy

NPD: Twelve Discoveries Made in Norway in 2012

The Norwegian Petroleum Directorate has announced that so far this year, 12 discoveries have been made on the Norwegian shelf. Six of these were made in the North Sea, and three in the Barents Sea and the Norwegian Sea respectively. A total of 27 wildcat wells have been completed, giving a discovery

about 14 years ago
Ownership Changes in Aibel (Norway)
Fossil Energy

Ownership Changes in Aibel (Norway)

Ratos, a Swedish limited company with an industrial focus that invests principally in medium-sized to large unlisted Nordic companies, and the Sixth AP Fund together with the Norwegian industrial and financial group Ferd, have signed an agreement to acquire all the shares in Aibel, a leading Norwegi

about 14 years ago
North Energy ASA: Jette Discovery Not Commercial (Norway)
Fossil Energy

North Energy ASA: Jette Discovery Not Commercial (Norway)

Drilling of exploration well 6607/12-3 on the Jette prospect in licence PL385 in the Norwegian Sea is about to be completed. According to a statement issued by North Energy ASA, the well has encountered gas, but preliminary calculations indicate that the discovery is not commercial. “More evaluation

about 14 years ago

Advertisement

Sinopec Buys 49 Pct of Talisman’s UK North Sea Business
Fossil Energy

Sinopec Buys 49 Pct of Talisman’s UK North Sea Business

Talisman Energy Inc. today announced the completion of its joint venture transaction with Addax Petroleum UK Limited (APUK), an indirect wholly-owned subsidiary of China Petrochemical Corporation (Sinopec Group) following receipt of government and regulatory approval. “We are very pleased to be part

about 14 years ago
VOS Sailor Severely Damaged, the Owner Says
Fossil Energy

VOS Sailor Severely Damaged, the Owner Says

Vroon Offshore Services has announced that its VOS Sailor ERRV has suffered severe damage following very rough weather conditions in the Balmoral Field off Aberdeen, UK, Saturday morning. As previously reported, one of the crew members on board the vessel has suffered fatal injuries as a result of t

about 14 years ago
Dana Petroleum Orders FPSO from COSCO Nantong?
Fossil Energy

Dana Petroleum Orders FPSO from COSCO Nantong?

China’s COSCO Nantong Shipyard Co. Ltd. today announced it has secured a contract valued over USD370 million from a European company to build an FPSO. The FPSO will measure 78 meters in diameter, 32 meters high and will have a storage capacity of up to 400,000 barrels of oil. The FPSO is scheduled f

about 14 years ago
Reef Subsea Completes Ormen Lange Job
Fossil Energy

Reef Subsea Completes Ormen Lange Job

Reef Subsea Dredging & Excavation announced today they have recently completed a fast track project for A/S Norske Shell on the Ormen Lange Mid North Development. From the initial seabed preparation contract, the company was awarded significant additional work on the project which lasted six months

about 14 years ago