Aquamarine Power has published the initial operational information gathered during the testing of their Oyster 800 wave machine at the European Marine Energy Centre (EMEC) in Orkney. The data collected shows a high correlation between Aquamarine Power’s predictions of Oyster 800 performance and the
Head of the New Energy at Bluewater Energy Services was awarded the title Engineer of the Year by the Prince Friso Engineers Prize held at University of Twente. Allard van Hoeken studied Mechanical Engineering at Delft University of Technology. From 1995, he held various positions at Bluewater Energ
DECC defends its renewables strategy that was strongly criticized in the report published by the Centre for Policy Studies. The report reads that the policy regarding renewable energy in UK represents the most expensive domestic policy disaster in modern British history, and that renewables subsidie
Fugro has introduced high accuracy G2+ service designed to help offshore operators with positioning and measurement accuracy. Applications for this service include offshore construction, survey services, vessel monitoring and structural monitoring. The service enables real-time correction of tidal c
Welsh Liberal Democrats have welcomed the news about the Governments plans to subsidy the proposed Swansea Bay tidal lagoon project. In the Budget 2015 report UK government announced its plans to enter formal negotiations with Swansea Bay tidal lagoon developer over the financing subsidy for Swansea
In UK’s Budget 2015 the government has announced investments in the creation of the new Energy Systems Catapult in Birmingham. The government will invest an initial GBP 60 million in a proposal made by six universities across the Midlands for a new Energy Research Accelerator, a major project to dev
RenewableUK has commented on Chancellor’s Budget 2015 announcement on financial support for Swansea Bay tidal lagoon project. The most important announcement for the renewables sector in the Budget 2015 is the one about the start of the commercial negotiations over Swansea Bay Tidal Lagoon, Renewabl
Chancellor George Osborne has announced today that the UK government is entering formal negotiations on financing subsidy for the Swansea Bay tidal lagoon project. UK government is opening of the negotiations on the subsidy for the proposed Swansea Bay tidal lagoon. In his Budget speech, the Chancel
The final phase of testing the Corpower WEC (wave energy conversion) technology is now completed and the project can now focus on full scale deployment activities. The project aims to industrialize a wave energy converter with five times higher energy density compared to existing technologies. The f
A variety of designs have been developed in order to harness the kinetic energy available in tidal streams. A report issued by EU’s Joint Research Centre (JRC) offers a classification of tidal energy converters (TECs). According to the 2014 JRC Ocean Energy Status Report, horizontal-axis turbines re
Scottish Renewables has appointed Patricia Hawthorn as Chairman and Gordon MacDougall as Vice-Chairman of the organization. Patricia Hawthorn, Partner at UK law firm Shepherd and Wedderburn, has been appointed Chairman of the renewables body. Patricia Hawthorn previously served as Scottish Renewable
EMEC and the Crown Estate have issued a report on the performance of subsea cabling in high energy environments to support the development of commercial wave and tidal energy sites. Sub-sea Cable Lifecycle Study aims to improve industry’s understanding of the best ways for managing subsea cables for
Bristol Tidal Energy Forum Eight will focus on the challenge of commercializing the tidal energy sector by addressing the issues surrounding the industry. The Biannual Bristol Tidal Energy Forum is an industry led, technical, discussion and networking forum. The aim of this year’s forum is to addres
SR2000 tidal turbine assembly well underway at Harland & Wolff’s facility, UK. Scotrenewables Tidal Power’s SR2000 tidal turbine will have a rated capacity of 2 MW at 3 m/s flow. It builds upon the SR250 tidal turbine prototype, with design and capacity improvements. It consists of a 64 m floating h