On Saturday 9 April 2011, the first monopile for Walney 2 was installed, and less than three months later all 51 monopiles have been installed. On Sunday 2 July 2011 the last of the 51 monopiles for Walney 2 was successfully driven into the sea bed, and thus the basic foundation for the 51 turbines
Community councillors in Dunbar have been updated on the progress of a proposed £1.2 billion offshore wind farm in the outer Forth estuary. Mainstream Renewable Power plans to start construction on the Neart na Gaoithe (Gaelic for ‘strength of the wind’) wind farm about 30 kilometres north of Tornes
The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network
The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network
Operating and financial overview: *On track to deliver full year earnings growth in 2011, despite commodity price volatility, challenging economic environment and higher UK upstream gas and oil tax rates *shift in profits from the downstream to the upstream *UK residential energy operating profit* h
Progress in internationalisation together with efficiency and sustained performance in all business lines placed Gamesa in a strong growth position in the first half of 2011, with results in line with annual guidance in terms of volume, profitability and debt. Gamesa’s consolidated revenues amounted
Jumbo Shipping has successfully transported 51 monopiles from EEW’s manufacturing plant in Rostock, Germany, to Barrow-in-Furness in the UK. The monopiles’ final destination was DONG Energy’s Walney Offshore Windfarm 2. When the contract was awarded, the first shipment was only seven weeks away, dur
Moray Offshore Renewables Ltd. , the joint venture company owned by EDP Renewables and Repsol, today awarded a historic contract to Gaoh Energy Ltd to install the first permanent offshore infrastructure to enable the development of offshore wind energy in the outer Moray Firth. Suffolk-based Gaoh En
The European Wind Energy Association (EWEA) today published offshore wind energy statistics for the first half year of 2011, showing a comfortable 4.5% increase in installations of offshore capacity compared to the first half of 2010. 101 new offshore wind turbines, with a total capacity of 348 Mega
The recent announcement by the UK Government of itʼs proposed plans for Electricity Market Reform (EMR) included a major boost for the offshore wind industry, with proposed legislation which the Government believes will support the deployment of up to 18GW of offshore wind by 2020, providing the cos
The recent announcement by the UK Government of itʼs proposed plans for Electricity Market Reform (EMR) included a major boost for the offshore wind industry, with proposed legislation which the Government believes will support the deployment of up to 18GW of offshore wind by 2020, providing the cos
EDP Renewables, a global leader in the renewable energy sector and the world’s third-largest wind energy producer, today announced that an additional 1.37 GW of capacity were installed over the last 12 months, of which 486 MW were added in 1H 2011 (around 60% of the expected installation for FY 2011
Harwich International Port welcomed the MPI Adventure on its maiden operational call to the port. In conjunction with the jack-up vessel Seaworker, which has been working at the port since March of this year, the MPI Adventure will begin installing monopile foundations and transition pieces for Phas
Offshore Solutions B.V. (OSBV), the joint venture between AMEC and Cofely Nederland N.V., has launched a free standing Offshore Access System (OAS) designed to significantly reduce installation time. OSBV has worked with Lowestoft-based, AKD Engineering to convert an existing OAS into a free standin