The Petroleum Safety Authority Norway (PSA) carried out an audit of Ekofisk 2/4-C and ConocoPhillips between 5 February and 22 March 2013. The audit was directed at the company’s follow-up of well barriers and well control equipment with associated control systems. Objective The objective of the aud
Technip was awarded by Statoil an engineering, procurement, construction and installation lump-sum contract for the Norne field development, located in the Norwegian Sea at a water depth of approximately 380 meters. The contract covers the: – engineering and fabrication of two flexible smoothbore ga
Coastline Surveys has completed a geotechnical investigation of the seabed cable route at the proposed Navitus Bay offshore wind park, off the South coast of England. Coastline Surveys, the Falmouth-based marine data consultancy, was delighted to be chosen to extend previous phases of work as the ma
Key geotechnical feasibility studies on the site of Wikinger offshore wind farm have been successfully concluded, with a total cost of €20 million. The studies comprised a full geological survey of the seabed in an area of some 34 square kilometres. Also, stratigraphic samples of sedimentary and met
Europa Oil & Gas (Holdings) plc, the AIM listed oil and gas exploration and development company with a combination of producing and exploration assets in Europe, announces Irish Government consent has been received for the transfer of interest and operatorship (`Transfer’) for its two Licensing Opti
Det norske oljeselskap ASA has come to an agreement with Total E&P Norge AS with regards to transfer of participating interests in three licenses. In the Barents Sea, Det norske assigns ten per cent of license 535, which contain the Norvarg discovery, to Total. After the transaction Det norske holds
Statoil and Total have reached agreement on asset swap in the Barents Sea. Statoil acquires 10% equity in PL535 in exchange for 10% equity in PL395. Production licenses PL395 and PL535 are situated on the Bjarmeland Platform in the central Barents Sea, where both companies have proved gas resources:
Ithaca Energy Inc. (“Ithaca” or the “Company”) announces the execution of a farm-out transaction with Shell UK Limited (“Shell”) in respect of the UK exploration assets acquired pursuant to the acquisition of Valiant Petroleum plc (“Valiant”), completed on 19 April 2013 (the “Acquisition”). The Comp
International marine engineering companies SeaRoc and McLaughlin & Harvey have announced a partnership to provide construction, installation and operation & maintenance services to tidal and wave energy developments. The companies have highly complementary competencies and capabilities and over the
HMS Ledbury has found the remains of a German sea mine from World War 2 on the very first day of her deployment. The mine was found by HMS Ledbury during a period of training to ensure the Royal Navy mine hunter is ready to operate as part of the Standing NATO Mine Countermeasures Group […]
CNRS has invited tenders for the construction of a coastal oceanographic vessel equipped for navigation complete with instruments for scientific research purposes. The vessel is to be used in and around the Port de Villefranche-sur-Mer in France. The proposed value of the contract is 750,000 EUR, an
Tekmar, the leading subsea technology company, has announced a £1million investment programme, which will more than treble the size of its North East England facility and create in excess of 30 new jobs. The Newton Aycliffe-based company is the market leader for the supply of offshore wind cable pro
The Board of Directors of Prysmian S.p.A. has approved the Group’s consolidated results for the first quarter 2013 (which are not subject to audit). Highlights: – SALES: €1,711 MILLION (€1,874 MILLION IN 1Q 2012; ORGANIC CHANGE -7.6%) – ADJ EBITDA1: €115 MILLION (€130 MILLION IN 1Q 2012; -11.6%) – A
Recently the transformer station for the offshore wind farm Global Tech I was successfully installed. The offshore platform is a core element of the North Sea wind farm: The power from its 80 wind turbines is gathered here and transformed from 30 to 155 kilovolts. The transmission grid operator will