In the wind turbine industry, understanding failure modes and identifying the root cause is key to being able to assess wind turbine drivetrain damage. With this knowledge comes the ability to reactively solve problems whilst implementing a strategic view of preventative or predictive maintenance. I
The Carbon Trust is looking for an offshore wind farm consultancy services to study which gravity base structures could reduce offshore wind cost more, lifted or floated. Gravity Base Structures (GBS), in terms of potential cost reduction, have very promising foundations concepts for wind turbine ge
The Carbon Trust is looking for an offshore wind farm consultancy services to study which gravity base structures could reduce offshore wind cost more, lifted or floated. Gravity Base Structures (GBS), in terms of potential cost reduction, have very promising foundations concepts for wind turbine ge
The Carbon Trust is seeking a contractor to undertake an offshore wind farm R&D study, called ‘The Maximising Lifetime Asset Integrity Study’. It is becoming more apparent within the Offshore Wind industry that several operating offshore wind farms are experiencing a higher level of structural issue
Gwind, the floating gyro stabilized Vertical Axis Wind Turbine (VAWT) for offshore and near-shore applications, was launched this week in the Stavanger Harbor area, Klasaskjer. The project is managed by TTO office Prekubator, while CMR Prototech and the University of Stavanger are partners in execut
The site of the proposed Dudgeon Offshore Wind Farm is 20 miles off the coast of Cromer, and since acquiring the project late last year, Statoil and Statkraft have undertaken a review of the project design and the seabed characteristics of the consented site. As of the result of this review Dudgeon
At today’s joint press conference of the German Wind Energy Association (BWE) and VDMA Power Systems held in Berlin, Deutsche WindGuard presented the current data on the status of wind energy development in Germany. In the first half of 2013 there were 406 wind turbines built onshore in Germany, wit
At today’s joint press conference of the German Wind Energy Association (BWE) and VDMA Power Systems held in Berlin, Deutsche WindGuard presented the current data on the status of wind energy development in Germany. In the first half of 2013 there were 406 wind turbines built onshore in Germany, wit
Maine Maritime Academy’s Tidal Energy Demonstration and Evaluation Center (TEDEC) in Castine is becoming ever more interesting to overseas companies, which want to test their tidal power technology. TEDEC acquired a sought-after series of permits to test scale models of tidal power projects, which m
EvoLogics GmbH now offers free access to EvoLogics communication and positioning emulator immediately after a purchase order for hardware. EvoLogics communication and positioning emulator is a hardware-free framework that allows to configure and run a network of virtual underwater acoustic modems on
Wind turbines are growing up. Environmental conditions for new locations are becoming more and more extreme, colder, and more salt-ridden due to offshore placement. At the same time, the turbines are getting bigger and bigger. This means that they need better reliability over longer periods of use.
AW-Energy Oy has commissioned Etteplan to handle the engineering design for a testing facility for its patented WaveRoller technology. The WaveRoller converts the surge phenomenon that takes place on the shoreline into electrical energy. Finnish-based AW-Energy is a world-leading company in the deve
The subsea vessel operations market is poised to see an increase in demand in the near term with day rates for some vessels set to increase. Between 2013 and 2017, Douglas-Westwood (DW) forecast $106 billion (bn) of expenditure on subsea vessel operations – an increase of 54% over the preceding five
Rapidly growing subsea products and equipment firm Ennsub is pleased to announce that it has secured a 14,000 sq ft production and office facility within the high-specification Tees Valley One Twenty scheme which forms part of the prestigious 700 acre Wynyard Park development in the Teesside area of