Aker Solutions’ operating revenues in the first quarter of 2011 were NOK 12 billion, and earnings before interest, tax, depreciation and amortisation amounted to NOK 1.8 billion, including profit from asset sales and non-recurring items. “The streamlining of our business is nearly complete, and Kvae
BMT Scientific Marine Services (BMT) has patented a strain measurement system and unique attachment scheme that can be integrated into the insulation and anti-corrosion layers on ultra deep water Steel Catenary Risers (SCRs). This technology was developed because production SCRs typically have thick
NSRI welcomes a wew PhD Student, Beenish Ayaz, who is about to begin her research project “Dynamically Reconfigurable Underwater Wireless Sensor Networking” Dynamically Reconfigurable Underwater Wireless Sensor Networking Land-based wireless sensor networking (WSN) is a highly active field of resear
Subsea 7, a global leader in seabed-to-surface engineering, construction and services, announced that it has completed the design and build of the first commercial AIV, a technology which has the potential to revolutionise Life-of-Field projects. Subsea 7 has an ambitious plan to develop a series of
University of Maine engineering students and researchers working at a facility in the Netherlands are now into the third week of testing… (physorg) [mappress] Source: physorg, May 03, 2011;
FLIR Systems, Inc. announced financial results for the first quarter ended March 31, 2011. Revenue was $373.5 million, up 30% compared to first quarter 2010 revenue of $287.3 million. Operating income in the first quarter was $76.6 million, compared to $84.3 million in the first quarter of 2010, and
Subsea 7 S.A. announced the publication of the 2010 Annual Report for its indirect subsidiary Subsea 7 Inc. for fiscal year 2010 which ended on December 31, 2010. Subsea 7 Annual Report 2010 Subsea 7 S.A. is a seabed-to-surface engineering, construction and services contractor to the offshore energy
Sway AS will test a 2.6 MW turbine on their own developed flow system. Testing is expected to start in the first quarter of 2013, and will have a duration of 5 years. The installation has a height above the sea-level of 60 meters, and stick 60 meters deep. Testing will take place in the […]
Sway AS will test a 2.6 MW turbine on their own developed flow system. Testing is expected to start in the first quarter of 2013, and will have a duration of 5 years. The installation has a height above the sea-level of 60 meters, and stick 60 meters deep. Testing will take place in the […]
The only thing you can say for certain about British weather is that it’s unpredictable. One minute the sun is shining. By Ellie Zolfagharifard (theengineer) [mappress] Source: theengineer, April 26, 2011;
Wind power manufacturer Vestas has announced it will complete the largest offshore wind turbine in the world. Glenn Meyers (cleantechnica) [mappress] Source: cleantechnica, April 24, 2011;
Oxygenation brings dead sea bottoms to life. This creates the necessary conditions for the establishment of new ecosystems that enable… (science) [mappress] Source: science, April 20, 2011
Oxygenation brings dead sea bottoms to life. This creates the necessary conditions for the establishment of new ecosystems that enable nature itself to deal with eutrophication. By conducting pilot studies in the fjord of Byfjorden and the inlet of Kanholmsfjärden, researchers at the University of G
Eni announces the names of the researchers and scientists awarded in the fifth edition of the Eni Award. The award was established in 2007 and over the years has become an international reference point for research in the fields of energy and the environment. The Eni Award aims to encourage a better