Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Storage

Loading filters...
Offshore WindWind FarmsOperations & MaintenanceAuthorities & GovernmentBusiness & Finance
Canyon Offshore to Bury Dudgeon Cables
Storage

Canyon Offshore to Bury Dudgeon Cables

Canyon Offshore Ltd, the robotics subsidiary of Helix Energy Solutions Group Inc., has been awarded a multi-million pound project with VBMS Ltd on the Statoil, Masdar and Stakraft Dudgeon Offshore Wind Farm for the supply of its services to provide the trenching solution for inter array cables. As p

about 11 years ago
Fugro to Install Rampion Array Cables
Storage

Fugro to Install Rampion Array Cables

Fugro has been awarded a contract for the installation and burial of array cables at the Rampion Offshore Wind Farm. The development in the English Channel, 13 kilometres off the Sussex coast, is being built by E.ON alongside partners, the UK Green Investment Bank plc. The engineering and planning w

about 11 years ago
TenneT Maps Borssele Wires Route
Storage

TenneT Maps Borssele Wires Route

TenneT, the Dutch electricity transmission system operator, has mapped the export cable route for the Borssele offshore wind farm zone. The cable will come ashore at Borssele, less than a kilometre from TenneT’s existing 380 kV substation. “This is the outcome of an intensive process, in which all i

about 11 years ago
Energinet.dk Postpones Anholt Cable Replacement
Storage

Energinet.dk Postpones Anholt Cable Replacement

Energinet.dk, the Danish transmission system operator, has decided to postpone Anholt offshore wind farm cable repair. The operation was scheduled for the late September. However, due to an error in NKT’s replacement cables, the work had to be pushed back. A new date will be announced promptly. “The

about 11 years ago
Van Oord Installs Gemini Substations
Storage

Van Oord Installs Gemini Substations

Van Oord has installed the two Offshore High Voltage Stations (OHVS) and first 77 transition pieces at the Dutch Gemini Wind Park. The realisation of the large offshore wind project construction is proceeding as planned. The OHVS installations were built in Hoboken, Belgium, and transported to Eemsh

about 11 years ago
Vos Prodect Guides Gemini Cables in Place
Storage

Vos Prodect Guides Gemini Cables in Place

The first two Vos Prodect’s monopile entry systems (Pro-MES) have been installed by Van Oord, at Gemini offshore wind farm project by the end of week 32. Pull-in of both first end and second end of the cable were completed on schedule and without any problems. Pro-MES systems have been tailored to t

about 11 years ago
Vos Prodect Guides Gemini Cables in Place
Storage

Vos Prodect Guides Gemini Cables in Place

The first two Vos Prodect’s monopile entry systems (Pro-MES) have been installed by Van Oord, at Gemini offshore wind farm project by the end of week 32. Pull-in of both first end and second end of the cable were completed on schedule and without any problems. Pro-MES systems have been tailored to t

about 11 years ago
VBMS to Install Rampion Wires
Storage

VBMS to Install Rampion Wires

VBMS has been awarded a contract by E.ON for the installation of two 16 kilometre-long export cables for the Rampion Offshore Wind Farm. The 150kV HVAC cables will transport the power ashore from the 400 MW wind farm to the onshore cable in Brooklands Pleasure Park in Worthing, South East England. V

about 11 years ago
Ofgem: Over £2.5 Bln New Transmission Investment Delivered since 2009
Storage

Ofgem: Over £2.5 Bln New Transmission Investment Delivered since 2009

By granting West of Duddon Sands (WoDS) Transmission plc a licence to own and operate the £269 million transmission link to the West of Duddon Sands offshore wind farm, the total new transmission investment delivered by the OFTO regime to date is over £2.5 billion, of which nearly £1 billion has now

about 11 years ago
DONG Energy Divests West of Duddon Sands Transmission Assets
Storage

DONG Energy Divests West of Duddon Sands Transmission Assets

West of Duddon Sands, a joint venture owned by DONG Energy and ScottishPower Renewables, has signed an agreement for the sale of transmission assets to WoDS Transmission plc. WoDS Transmission plc is owned by a consortium comprising of Macquarie Corporate Holdings Pty Limited and 3i Infrastructure p

about 11 years ago
Tekmar TekLink Installed on Gemini
Storage

Tekmar TekLink Installed on Gemini

Work to install the Tekmar Energy’s TekLink cable protection system (CPS) has started on what is poised to be one of the world’s largest offshore wind parks, the Gemini project in the Dutch North Sea. The contract with the Dutch maritime contractor Van Oord involves implementing Tekmar’s 6th generat

about 11 years ago
BSH OKs Ostwind 1 Offshore Cable Project
Storage

BSH OKs Ostwind 1 Offshore Cable Project

50Hertz has received an approval for its Ostwind 1 offshore cable project within the EEZ from Federal Maritime and Hydrographic Agency of Germany (BSH). “We are greatly pleased with the permit for this last 20 kilometre section in the EEZ. This means that the entire cable route is now approved,” sai

about 11 years ago
OMM’s New Tool Completes Gode Wind 1 Work
Storage

OMM’s New Tool Completes Gode Wind 1 Work

Offshore Marine Management (OMM) has used its new tool, the MDS3, to lay mattresses for client NSW – the main contractor for the manufacture and installation of export cable for the Gode Wind 1 offshore wind farm. The tool was designed and developed by OMM based on its extensive offshore project exp

about 11 years ago
OMM’s New Tool Completes Gode Wind 1 Work
Storage

OMM’s New Tool Completes Gode Wind 1 Work

Offshore Marine Management (OMM) has used its new tool, the MDS3, to lay mattresses for client NSW – the main contractor for the manufacture and installation of export cable for the Gode Wind 1 offshore wind farm. The tool was designed and developed by OMM based on its extensive offshore project exp

about 11 years ago
  • 1
  • …
  • 111
  • 112
  • 113
  • …
  • 181