In the early hours of 16 June, the Norwegian Petroleum Directorate began acquiring two-dimensional (2D) seismic data in the northeast part of the Barents Sea. In all, approximately 14,300 kilometres (40 lines) of seismic data will be acquired in this area. The work will be carried out by the vessel
The last foundation for Lincs Offshore Wind Farm off the east coast of England is now in place. MT Højgaard is EPCI contractor for the giant foundations. All 75 offshore wind turbine foundations for the 270 MW Lincs Wind Farm off the east coast of England is now in place. MT Højgaard has designed, p
Marit Arnstad has informed that she will resign from her position as deputy chair and member of the board of directors in Statoil ASA with immediate effect. The nomination committee in Statoil will start its search for a new board member, and the corporate assembly will make a by-election when the n
Technip was awarded by Marathon Oil Norge AS an engineering, procurement, installation and commissioning contract, worth above €300 million, for the Bøyla field development in the North Sea, located about 225 kilometers West of Stavanger, Norway, at a water depth of 120 meters. The contract includes
On 18 June Thialf, one of the world’s biggest heavy lift vessels, lifted the 9,000 tonne steel jacket into position on the North Sea Valemon field. The 160 metre high construction is the biggest steel jacket installed in one lift on the Norwegian continental shelf (NCS) and first major part-delivery
Titan Survey has been involved in marine surveys both in the UK and worldwide for over 30 years and is increasingly involved in offshore renewable energy schemes, particularly wind farm projects, where an accurate interrogation of the subsea geology is so crucial to turbine foundation design, as wel
On June 6th, Kenz Cranes, well-known specialist in offshore lifting and hoisting solutions, successfully delivered the new build 12t ram luffing pedestal crane. The crane was handed over to the Sea Trucks Group (STG) for installation onboard the newly build DP-2 construction support vessel ‘Jascon 5
Oceaneering has unveiled an USD 23.5 million (GBP 15.2 million) investment into a new facility at its base in Rosyth, which will allow the company to dive into the offshore renewable energy market, the Scotsman informs. The American-based company plans to construct a larger storage space where it wi
Liverpool headquartered Bibby Line Group grew revenues by 12.1 per cent to £1,295m (2010: £1,156m) in the year to 31 December 2011. The diversified group – which has a wide portfolio of interests including shipping, marine services, logistics, financial services and retail – reported record operatin
The relatively young company METAS has already developed several advanced products for sale. In these days the award winner also awaits important test results from development projects that may greatly improve safety of future subsea operations. Detecting leaks are key words for the two main develop
The company that is planning to construct a tidal barrage on the River Wyre estuary says they are ready to fight gas storage company. Namely, the Wyre Tidal Energy has been established to promote and deliver the construction of a tidal barrage across the Wyre Estuary to produce renewable electricity
This month saw the 50th Marine Measurement Forum (MMF) take place at Portsmouth Historic Dockyard on Tuesday 12th June where Sonardyne International Ltd’s Engineering Director, Simon Partridge, was invited to present. Held within the prestigious Princess Royal Gallery at the National Museum of the R
Plexus Holdings PLC, the AIM quoted oil and gas engineering services business and owner of the proprietary POS-GRIP® method of wellhead engineering, announces that Eni S.p.A, the Italian oil and gas major, and Oil States Industries Inc. a subsidiary of Oil States International Inc., a leading USA ma
Subsea 7 S.A. announced the award of a contract valued at approximately $95 million in the UK Central North Sea with an international oil and gas operator. The contract scope includes the project management, engineering, procurement, fabrication and installation of a 7.5km pipeline bundle containing