The Port of Wells dredging project will commence on January 20th. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 4 and 2. All material dredged from these areas will be placed on the berm which is marked by the port hand
Monday, January 13th witnessed the official opening ceremony of Damen Shipyards Sharjah FZE – the newest shipyard of Albwardy Marine Engineering. In a joint venture between the Damen Shipyards Group and Albwardy Marine Engineering, the core activities at DSS will continue along the tried and trusted
After concerns from a member of the public, the Marine Management Organisation investigated four alleged breaches of the Marine Licence for dredging operations at Wells Harbour: 1) Deposit of unauthorised dredged material at Wells Harbour; 2) Height of dredged materials deposited at Wells Harbour; 3
A further flood funding boost of £500,000 has been proposed for river dredging by Somerset County Council yesterday, and it brings the total proposed by the council to £1m. The Council is planning to up its offer of £300,000 for dredging, and £200,000 for local flood prevention schemes, to a total o
The Royal Bath and West of England Society announced they would start a Somerset Levels Relief Fund in September 2013. Since then the Society has brought together the various bodies and agencies involved, including farmers, the Environment Agency, Internal Drainage Boards, Somerset County Council, t
All three wind turbine blades have been installed on the V164-8.0 MW prototype at the Danish national test centre in Østerild, Vestas announced. The company said that good weather conditions on the night of January 13 allowed the installation of all three 80m long blades of the offshore wind turbine
The Port of Kiel successfully maintained its sound handling result in 2013. With a performance of 6.32 million tons the result for the previous year was even slightly surpassed by 12,000 tons resp. 0.2 %. The ferry lines form the backbone of the port’s business, rising up to 5.1 million tons (plus 1
Mainstream Renewable Power has deployed the North Sea’s first commercial floating LiDAR wind measurement device, designed to capture wind data in the harshest conditions, to support its proposed 450MW Neart Na Gaoithe offshore wind farm. A deal has been signed with technology providers FLiDAR NV, fo
TÜV Rheinland received a contract from AREVA Wind GmbH for the commissioning inspection of the elevator and service lifts for the new offshore wind farm Global Tech I. In total there are 80 turbines of AREVA Wind’s model M5000 developed specifically for offshore wind projects with around five megawa
ZephIR Lidar, the industry-leading wind lidar manufacturer, has announced that its flagship system, ZephIR 300, has been successfully verified against a fully IEC compliant met mast at the Lelystad Test Site. The verification, carried out by Ecofys WTTS in parallel with three other ZephIRs, deems th
Specialist plant hirer, Land & Water were contacted by A-Plant and the Environment Agency around midday on Thursday 12th December immediately after the first big tidal surge of the winter with an urgent request to supply a very specialist machine to repair flood defences that had been damaged during
Claire Greenwood, a member of Land and Water Services’ senior management team has had a journal on spot dredging activity published by the institute of Civil Engineers. Claire’s paper ‘Preserving canals through innovating maintenance spot dredging’ goes on to describe how the innovative use of coast
In March 2013, Norwegian Centre for Offshore Wind Energy (NORCOWE) inaugurated a measurement campaign at Sola airport outside of Stavanger, Norway. The equipment installed consisted of one scanning and one static wind LiDAR system. In addition a second static wind LiDAR was installed some 3 km furth
Statoil has awarded two contracts to Siemens plc for the engineering, supply, assembly, commissioning and service of 67 wind turbine generators for the Dudgeon Offshore Wind Farm project. The wind turbine generator (WTG) supply contract will cover engineering, procurement, assembly and offshore comm