Fermin Catalán, Chief Engineer for the Gamesa’s new G11X offshore turbine, a 5-MW platform, has been named the wind innovator 2012, Windpower Engineering news portal reports. “My first experience with renewable energy came from my brothers who built a parabolic solar collector for fun,” says Mr Cata
The number of employees in offshore wind industry in Germany rose from 6,900 employees in 2010 to 8,600 in 2011. The Federal Government said that the offshore wind energy is a new technological sector, for which there are no specific education and training programs. There were initial approaches and
DeTect has completed the installation of the MERLIN Avian Radar System at the wind farm substation on Thornton Bank, reports Windtech International. Last year in January, the Management Unit of the North Sea Mathematical Models (MUMM) acquired the radar system to track the bird movement along the co
An important part of the TAP service is the provision of trained, expert operators who are able to ensure that the Echoscope™ is operating optimally as soon as it’s installed, and is providing imagery and recorded data to suit the customer’s requirements. In order to meet the level of demand that th
As part of continual company growth and development, Coastline Surveys Ltd has placed an order for the purchase of a DATEM 5000 CPT system. The DATEM 5000 unit is a coiled rod design offering the latest technology and increased push capability compared to similar CPT designs available. The unit is c
Umeco will be exhibiting its Structural materials and Tooling prepreg technologies for the renewable energy market on Stand F89 at the 2012 All-Energy show in the Aberdeen Exhibition and Conference Centre – Bridge of Don, Aberdeen on the 23 and 24 May. The stand will feature a 1/72 scale model of th
Europe’s primary event for the wind industry, EWEA 2012, in Bella Center in Copenhagen was a great success. More than 500 exhibitors and over 10.000 visitors joined the exhibition and conference. Avanti Wind System was among the exhibitors. The exhibition visitors had the opportunity to take a close
Europe’s primary event for the wind industry, EWEA 2012, in Bella Center in Copenhagen was a great success. More than 500 exhibitors and over 10.000 visitors joined the exhibition and conference. Avanti Wind System was among the exhibitors. The exhibition visitors had the opportunity to take a close
Renewables businesses in the Humber are being urged to get involved with a new development in wind technology. Ambitious plans have been unveiled for floating wind turbines to harness more offshore wind power at potentially lower cost. The UK and US are set to work together to develop floating wind
Hydrodynamicists at Pelamis Wave Power have published a scientific paper that could have profound implications for the race to commercial production of wave energy converter machines, after proving the theoretical advantage of line absorbers over point absorbers. The paper entitled “Maximum wave-pow
Safety systems and machine productivity specialist Prolec has set the date for the biggest and most significant product launch in the company’s history. The first product models from an entirely new modular range focused on machine safety will be unveiled at an event being staged at Donington Park R
GL Renewables Certification (GL RC) has issued a Statement of Compliance for the A-Design Assessment of the Sinovel SL 3000/90 50 Hz offshore wind turbine. The Statement of Compliance confirms that SL 3000/90 meets the requirements of GL RC’s “Guideline for the Certification of Offshore Wind Turbine
GL Renewables Certification (GL RC) has issued a Statement of Compliance for the A-Design Assessment of the Sinovel SL 3000/90 50 Hz offshore wind turbine. The Statement of Compliance confirms that SL 3000/90 meets the requirements of GL RC’s “Guideline for the Certification of Offshore Wind Turbine
Kongsberg Maritime is the owner of the ‘Windsense’ project, which aims to develop a new and flexible instrumentation system for wind turbines. The system will help to make wind power more economically competitive. The project, which amounts to 22 million NOK, has been initiated through collaboration