Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsProject & TendersBusiness & FinanceAuthorities & GovernmentOperations & Maintenance
50 Hornsea One Turbines Left to Go
Wind Farms

50 Hornsea One Turbines Left to Go

124 out of 174 Siemens Gamesa 7MW turbines have been installed and commissioned at the Hornsea Project One wind farm in the UK, a spokesperson from Ørsted told Offshore WIND. Fred. Olsen Windcarrier’s jack-up vessel Bold Tern is in charge of installing 88 out of the 174 turbines, with A2SEA’s Sea Ch

about 7 years ago
Pipeshield Loads Out EA1 Second Phase Scour Protection
Wind Farms

Pipeshield Loads Out EA1 Second Phase Scour Protection

Pipeshield International Ltd has loaded out the second phase scour protection for the East Anglia One offshore wind farm in the UK. Pipeshield manufactured and supplied more than 300 fronded concrete mattresses, which were loaded in stacks of six using the company’s high payload wet store bases. Usi

about 7 years ago
Tekmar Wins Hornsea Two Contract
Wind Farms

Tekmar Wins Hornsea Two Contract

Tekmar Energy has signed a contract with Ørsted to provide Cable Protection Systems for the 1.4GW Hornsea Two offshore wind farm. Tekmar will provide their patented Tekmar Cable Protection System (CPS) TekLink® Mechanical Latch for the wind farm, which when constructed will become the world’s larges

about 7 years ago
Tekmar Wins Hornsea Two Contract
Wind Farms

Tekmar Wins Hornsea Two Contract

Tekmar Energy has signed a contract with Ørsted to provide Cable Protection Systems for the 1.4GW Hornsea Two offshore wind farm. Tekmar will provide their patented Tekmar Cable Protection System (CPS) TekLink® Mechanical Latch for the wind farm, which when constructed will become the world’s larges

about 7 years ago
WindFloat Atlantic Gets Unspent NER300 Funds
Wind Farms

WindFloat Atlantic Gets Unspent NER300 Funds

The European Commission has reinvested a portion of unspent funds from the NER300 programme to support the 25MW WindFloat Atlantic floating wind project offshore Portugal. WindFloat will be the first offshore windfarm employing a floating semi-submersible platform to reach the pre-commercial stage f

about 7 years ago
European Commission Okays Support for Six French OWFs
Wind Farms

European Commission Okays Support for Six French OWFs

The European Commission has approved the support for six French offshore wind farms selected in the country’s first two tendering rounds. The projects include Courseulles-sur-Mer, Fécamp, Saint-Nazaire and Saint-Brieuc from the Round 1 tender in 2012, as well as Round 2 winners Dieppe-Le Tréport and

about 7 years ago
First Subsea Wins Kincardine Contract
Wind Farms

First Subsea Wins Kincardine Contract

First Subsea Ltd has won a contract to provide platform mooring connectors to the Kincardine floating offshore wind farm situated off the coast of Aberdeen in Scotland. The company, part of the First Tech Group based in Aberdeen, has confirmed it’s secured the contract with Spanish developer and con

about 7 years ago
First Subsea Wins Kincardine Contract
Wind Farms

First Subsea Wins Kincardine Contract

First Subsea Ltd has won a contract to provide platform mooring connectors to the Kincardine floating offshore wind farm situated off the coast of Aberdeen in Scotland. The company, part of the First Tech Group based in Aberdeen, has confirmed it’s secured the contract with Spanish developer and con

about 7 years ago
French Top Court Clears Saint-Brieuc Offshore Wind Farm
Wind Farms

French Top Court Clears Saint-Brieuc Offshore Wind Farm

The French Council of State has rejected appeals opposing the construction of the Bay of Saint-Brieuc offshore wind project being developed by Ailes Marines. Environmental conservation organization Gardez les caps and Nass & Wind, who competed in the tender for developing the wind farm, submitted th

about 7 years ago
Bibby HydroMap Sends SeaZip Fix to Hollandse Kust Zuid I & II
Wind Farms

Bibby HydroMap Sends SeaZip Fix to Hollandse Kust Zuid I & II

Bibby HydroMap has taken the survey vessel SeaZip Fix on charter from Seazip Offshore Service. Rebuilt in 2015, the 42m DP1 Ice Class vessel will supplement the existing Bibby HydroMap fleet and will commence seismic survey operations on Hollandse Kust Zuid I & II in the Dutch North Sea on behalf of

about 7 years ago
First TWBII Turbine Parts Embark on Taillevent
Wind Farms

First TWBII Turbine Parts Embark on Taillevent

Jan De Nul’s offshore installation vessel Taillevent has begun loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm. The 200MW TWBII offshore wind farm will comprise 32 Senvion 6.2M152 turbines installed at the project site some 40km north of the island

about 7 years ago
Rigmar Enters Offshore Wind Big League with EOWDC Contract
Wind Farms

Rigmar Enters Offshore Wind Big League with EOWDC Contract

Vattenfall has contracted the Aberdeen-based Rigmar to inspect and maintain subsea structures and cables as well as foundations, turbine transition pieces, subsea cabling, and boat landings at the European Offshore Wind Deployment Centre (EOWDC). This is Rigmar’s first win as a main contractor in of

about 7 years ago
Thanet Extension DCO Application Exits Examination Phase
Wind Farms

Thanet Extension DCO Application Exits Examination Phase

The UK Planning Inspectorate has completed the examination of Vattenfall’s application for the Development Consent Order (DCO) for the Thanet Extension offshore wind farm. The Examining Authority informed that the findings, conclusions and recommendations from the examination will be sent to the Sec

about 7 years ago
Thanet Extension DCO Application Exits Examination Phase
Wind Farms

Thanet Extension DCO Application Exits Examination Phase

The UK Planning Inspectorate has completed the examination of Vattenfall’s application for the Development Consent Order (DCO) for the Thanet Extension offshore wind farm. The Examining Authority informed that the findings, conclusions and recommendations from the examination will be sent to the Sec

about 7 years ago
  • 1
  • …
  • 140
  • 141
  • 142
  • …
  • 399