Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsOperations & MaintenanceTechnologyStorageBusiness & Finance
Rampion Met Mast Lattice to Be Removed from Seabed
Wind Farms

Rampion Met Mast Lattice to Be Removed from Seabed

E.ON has filed an application to the Marine Management Organisation (MMO) for the removal of Rampion’s met mast lattice structure, which disconnected from the platform and collapsed into the water in 2014. According to the document, the structure will be removed by Fugro Seacore, now one of Fugro Ge

about 10 years ago
Norfolk Marine Wraps Up Bathymetric Survey at Scroby Sands
Wind Farms

Norfolk Marine Wraps Up Bathymetric Survey at Scroby Sands

Norfolk Marine Ltd has completed a bathymetric survey of five turbine foundations at the 60MW Scroby Sands offshore wind farm. The company used its WFS & Survey vessel the Norfolk Swift to carry out the survey. This was the final section of works within a contract to install the company’s TFN Scour

about 10 years ago
GeoSea Halfway Through Nordsee One Foundation Installation
Wind Farms

GeoSea Halfway Through Nordsee One Foundation Installation

The 27th monopile and its corresponding transition piece were installed at Nordsee One on 7 March, according to the consultancy company Con4Mare. This means that GeoSea, which is in charge of the installation of all monopiles and transition pieces at the wind farm’s site, has finished 50% of the wor

about 10 years ago
GeoSea Halfway Through Nordsee One Foundation Installation
Wind Farms

GeoSea Halfway Through Nordsee One Foundation Installation

The 27th monopile and its corresponding transition piece were installed at Nordsee One on 7 March, according to the consultancy company Con4Mare. This means that GeoSea, which is in charge of the installation of all monopiles and transition pieces at the wind farm’s site, has finished 50% of the wor

about 10 years ago
Heerema to Handle Borkum Riffgrund 2 Substation
Wind Farms

Heerema to Handle Borkum Riffgrund 2 Substation

DONG Energy has awarded a contract to Heerema Marine Contractors for the transport and installation of an offshore substation for the Borkum Riffgrund 2 offshore wind farm. The work will comprise the transport and installation of the substation’s jacket, piles and topside at the German offshore wind

about 10 years ago
Two Bombs Found at Rampion Site
Wind Farms

Two Bombs Found at Rampion Site

During the unexploded ordnance (UXO) surveys at the Rampion offshore wind site, two unexploded items have been found. The bombs, possibly from the Second World War 2 or even earlier, were located within close vicinity of each other within the offshore site. Nevertheless, the offshore construction is

about 10 years ago
Construction of Nobelwind Kicks Off
Wind Farms

Construction of Nobelwind Kicks Off

Nobelwind has announced the beginning of construction works for Belgian Nobelwind offshore wind farm, also known as Belwind 2 or Bligh Bank II. The first activities will be performed in the port of Oostende, on the REBO site, where the first foundation components are expected to arrive today (March

about 10 years ago
AMS No-Dig to Supply Cable Ducts for World’s Largest OWF
Wind Farms

AMS No-Dig to Supply Cable Ducts for World’s Largest OWF

DONG Energ today awarded a contract to the UK company AMS No-Dig for the design, supply and install cable ducts for the Hornsea Project One offshore wind farm. AMS No-Dig will supply and install three cable ducts approximately 200 metres long under the sea defence at Horseshoe Bay, south of Grimsby.

about 10 years ago
AMS No-Dig to Supply Cable Ducts for World’s Largest OWF
Wind Farms

AMS No-Dig to Supply Cable Ducts for World’s Largest OWF

DONG Energ today awarded a contract to the UK company AMS No-Dig for the design, supply and install cable ducts for the Hornsea Project One offshore wind farm. AMS No-Dig will supply and install three cable ducts approximately 200 metres long under the sea defence at Horseshoe Bay, south of Grimsby.

about 10 years ago
Balfour Beatty Nets GBP 5.5M Hywind Scotland Contract
Wind Farms

Balfour Beatty Nets GBP 5.5M Hywind Scotland Contract

Statoil has awarded Balfour Beatty with a GBP 5.5 million EPCI contract for a substation and onshore cable for the Hywind Scotland Pilot Park, world’s first floating offshore wind farm. Jonathan Chapman, Director of Offshore for Balfour Beatty said: “This is an exciting market for us and we look for

about 10 years ago
Balfour Beatty Nets GBP 5.5M Hywind Scotland Contract
Wind Farms

Balfour Beatty Nets GBP 5.5M Hywind Scotland Contract

Statoil has awarded Balfour Beatty with a GBP 5.5 million EPCI contract for a substation and onshore cable for the Hywind Scotland Pilot Park, world’s first floating offshore wind farm. Jonathan Chapman, Director of Offshore for Balfour Beatty said: “This is an exciting market for us and we look for

about 10 years ago
Ocean Breeze Sticks With Siem Offshore
Wind Farms

Ocean Breeze Sticks With Siem Offshore

Germany’s Ocean Breeze Energy has awarded Siem Offshore Contractors GmbH (SOC), a wholly owned subsidiary of Siem Offshore Inc., with a new contract for the provision of a walk-to-work (W2W) service operations vessel (SOV) for the Bard Offshore 1 wind farm. The contract will involve the deployment o

about 10 years ago
Ocean Breeze Sticks With Siem Offshore
Wind Farms

Ocean Breeze Sticks With Siem Offshore

Germany’s Ocean Breeze Energy has awarded Siem Offshore Contractors GmbH (SOC), a wholly owned subsidiary of Siem Offshore Inc., with a new contract for the provision of a walk-to-work (W2W) service operations vessel (SOV) for the Bard Offshore 1 wind farm. The contract will involve the deployment o

about 10 years ago
Euro-Rigging Kits Seajacks Scylla Out with Pile Gripper Frame
Wind Farms

Euro-Rigging Kits Seajacks Scylla Out with Pile Gripper Frame

Dutch heavy mechanical engineering specialist Euro-Rigging has today delivered a pile gripper frame to be installed on Seajacks Scylla at the port of IJmuiden. Seajacks Scylla, the world’s largest wind turbine installation vessel, arrived at the port of IJmuiden on 14 March in preparation of its fir

about 10 years ago
  • 1
  • …
  • 301
  • 302
  • 303
  • …
  • 399