Phase one of the Borkum West II offshore wind farm, a 200MW development in the German North Sea, completed construction, with lender’s technical advisor support from SgurrEnergy. The last of the 40 wind turbines, located approximately 45km north of the island of Borkum, was successfully installed du
Ballast Nedam has signed a contract for the installation of monopiles at the German Amrumbank West offshore wind farm with E.ON. Ballast Nedam will erect monopiles and provide the logistics between the feeder port in Cuxhaven and the Amrumbank West offshore wind farm. The E.ON Amrumbank West offshor
Walk-to-Work Offshore Support Accommodation vessel DP GALYNA was contracted by Forewind for operation and maintenance work to its two meteorological masts on North Sea’s Dogger Bank, located approximately 150 km off the east coast of Yorkshire. DP GALYNA sailed to Great Yarmouth to take on board the
Walk-to-Work Offshore Support Accommodation vessel DP GALYNA was contracted by Forewind for operation and maintenance work to its two meteorological masts on North Sea’s Dogger Bank, located approximately 150 km off the east coast of Yorkshire. DP GALYNA sailed to Great Yarmouth to take on board the
Van Oord kicked off the construction works on a 129MW wind farm located in the Dutch area of the North Sea. Yesterday, the wind turbine construction jack-up vessel Aeolus commenced the foundation installation at Eneco Luchterduinen offshore wind farm. The wind energy project will comprise 43 Vestas
Van Oord kicked off the construction works on a 129MW wind farm located in the Dutch area of the North Sea. Yesterday, the wind turbine construction jack-up vessel Aeolus commenced the foundation installation at Eneco Luchterduinen offshore wind farm. The wind energy project will comprise 43 Vestas
GeoSea has just finalized the installation of 77 foundations on the DONG Energy Borkum Riffgrund 1 offshore wind farm. The installation works, including transport from the fabrication yard to the marshalling harbor, have proceeded in record times and finished ahead of schedule. The 77 units consiste
BOW Terminal announced working on the Gemini offshore wind farm project. A 600MW fully consented offshore wind farm, to be located 55 kilometers north of the island of Schiermonnikoog in the Dutch North Sea. BOW Terminal is responsible for storage and load transfers of 75 pile foundations. The BOW T
Vattenfall installed its 1000th wind turbine last week at DanTysk offshore wind farm situated west of the island of Sylt. The Siemens 3.6 MW wind turbine was installed at the location DT19, within the 70 square kilometres area covered by the wind farm. Vattenfall currently operates 944 wind turbines
Vattenfall installed its 1000th wind turbine last week at DanTysk offshore wind farm situated west of the island of Sylt. The Siemens 3.6 MW wind turbine was installed at the location DT19, within the 70 square kilometres area covered by the wind farm. Vattenfall currently operates 944 wind turbines
Eolien Maritime France, a consortium of EDF EN and DONG Energy, is seeking contractors for geotechnical investigations at three wind farm locations off French coast. Up to six contractors will collect information which will be used for detailed design of wind turbine and potentially substation found
Today, Tuesday 22nd July 2014, Ballast Nedam Offshore installed the 80th and last monopile at the Butendiek Offshore Wind Farm in the German sector of the North Sea. The installation of all these monopiles was completed well within four-month time. This exceptional achievement is entirely due to the
Siemens has installed a fourth offshore platform in the North Sea, completing an important stage for grid connections of sea-based wind farms. This is the platform for the SylWin1 DC link, which is the most powerful of the four offshore wind power grid connections contracted to Siemens by the German
A wedding was celebrated on the Nordsee Ost offshore wind farm construction site of RWE Innogy: This is what the construction process is called when the foundation is successfully married to the substation platform. As a result the sea-based transformer substation and all its electrical components h