Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsAuthorities & Government
‘Victoria Mathias’ Installs First Foundations at Nordsee Ost Offshore Wind Farm (Germany)
Wind Farms

‘Victoria Mathias’ Installs First Foundations at Nordsee Ost Offshore Wind Farm (Germany)

The first foundations at the Nordsee Ost offshore wind farm have been installed. The main crane of the Victoria Mathias lifts the 550-tonne steel foundations into the water. Whith roughly 40- to 50-metre-long steel piles the foundations are fixed into the seafloor. Then a hydraulic hammer knocks the

about 14 years ago
Last Construction Vessel Leaves Site, New Phase Begins for Sheringham Shoal (UK)
Wind Farms

Last Construction Vessel Leaves Site, New Phase Begins for Sheringham Shoal (UK)

The departure of the floating hotel Regina Baltica, which was the final construction vessel on the Sheringham Shoal offshore wind farm, marks the end of an intense period of activity and the start a new operational phase, which has been in the planning for the past five years. Now the only vessels t

about 14 years ago
UK: Two Applications to Speed Up Dogger Bank Development
Wind Farms

UK: Two Applications to Speed Up Dogger Bank Development

Forewind’s second stage of offshore wind development, Dogger Bank Teesside will be divided into two separate Development Consent Order (DCO) applications, each for two offshore wind projects. Dogger Bank Teesside will comprise four wind farms, which could have a total installed capacity of up to 4.8

about 14 years ago
UK: EAOW Submits East Anglia ONE Planning Application
Wind Farms

UK: EAOW Submits East Anglia ONE Planning Application

Planning application for East Anglia ONE offshore wind farm has been submitted by East Anglia Offshore Wind (EAOW), a joint venture between Vattenfall and ScottishPower Renewables, EADT24 news site reports. National Infrastructure Directorate will now consider the planning application and, if approv

about 14 years ago
UK: EAOW Submits East Anglia ONE Planning Application
Wind Farms

UK: EAOW Submits East Anglia ONE Planning Application

Planning application for East Anglia ONE offshore wind farm has been submitted by East Anglia Offshore Wind (EAOW), a joint venture between Vattenfall and ScottishPower Renewables, EADT24 news site reports. National Infrastructure Directorate will now consider the planning application and, if approv

about 14 years ago
E.ON Revises Rampion Offshore Wind Farm Proposal Prior to Submission (UK)
Wind Farms

E.ON Revises Rampion Offshore Wind Farm Proposal Prior to Submission (UK)

Over the last year, E.ON has listened to feedback received from over 1,000 people and organisations in Sussex through a major community consultation and has made changes to its Rampion Offshore Wind Farm proposals which were submitted to the Planning Inspectorate on Friday 14 December. The final pla

about 14 years ago
Turbine Installation Starts Soon at Teesside Offshore Wind Farm (UK)
Wind Farms

Turbine Installation Starts Soon at Teesside Offshore Wind Farm (UK)

EDF Energy Renewables has announced that the installation of wind turbines on the Teesside Offshore Windfarm, under construction off the North East coast at Redcar, will resume soon and will be undertaken using the MPI Adventure. A spokesperson for EDF Energy Renewables explained: “As the project ha

about 14 years ago
UK: Solstad Charters Normand Tonjer for Gwynt y Mor Offshore Wind Farm
Wind Farms

UK: Solstad Charters Normand Tonjer for Gwynt y Mor Offshore Wind Farm

Solstad Shipping announced that the company has signed a contract with Gwynt y Mor Offshore Wind Farm Limited, on behalf of developers RWE Innogy, Stadwerke München and Siemens , to charter CSV “Normand Tonjer”. The contract will last 17 months and it will commence this month, as soon as the vessel

about 14 years ago
ScottishPower Renewables Pauses Argyll Array Development for One Year
Wind Farms

ScottishPower Renewables Pauses Argyll Array Development for One Year

The development of the Argyll Array offshore wind farm will be paused for a year, according to an update by ScottishPower Renewables (SPR), published on the website of the campaigning group No Tiree Array. In its update on the project, SPR says the following: ScottishPower Renewables has put the dev

about 14 years ago
ScottishPower Renewables Pauses Argyll Array Development for One Year
Wind Farms

ScottishPower Renewables Pauses Argyll Array Development for One Year

The development of the Argyll Array offshore wind farm will be paused for a year, according to an update by ScottishPower Renewables (SPR), published on the website of the campaigning group No Tiree Array. In its update on the project, SPR says the following: ScottishPower Renewables has put the dev

about 14 years ago
Norway Puts Its First Offshore Wind Farm on Hold
Wind Farms

Norway Puts Its First Offshore Wind Farm on Hold

Norway’s first licensed offshore wind farm, Havsul, is on hold until further notice. Vestavind Offshore AS, which owns the project, sees no possibility for investment in offshore wind power in Norway within the current regulatory framework. Chairman of Vestavind Offshore Board Wenche Teigland, said

about 14 years ago
Local Residents Concerned over Irish Sea Wind Farm
Wind Farms

Local Residents Concerned over Irish Sea Wind Farm

Development of offshore wind farms in the Irish Sea has raised a myriad of concerns for the local residents, voiced during Celtic Array’s public consultation period, one of them being cutting off of ferry routes. Centrica and Dong Energy consortium, Celtic Array, launched a public consultation proce

about 14 years ago
Germany: Windreich Makes No Extra Costs for Consumers
Wind Farms

Germany: Windreich Makes No Extra Costs for Consumers

The construction and connection to the grid of Windreich’s North Sea projects Global Tech I, Deutsche Bucht and MEG 1 are running right on schedule. This makes Windreich AG the only project planner that hasn’t caused any additional burden for the consumers. “The largest investment is needed for the

about 14 years ago
Germany: Six Foundations Installed at Global Tech I
Wind Farms

Germany: Six Foundations Installed at Global Tech I

In just 16 days, during the second visit to the Global Tech I construction site, three more foundations were installed. The installation vessel INNOVATION proved to be extremely reliable in installation of the tripod foundations in 40 meters water depth. Arjen Schampers, Technical Director of Global

about 14 years ago
  • 1
  • …
  • 385
  • 386
  • 387
  • …
  • 399