Advertisement

Marine Energy

about 10 years ago

Video: Substation construction for SEENEOH tidal site

The video shows the construction of the power substation for the SEENEOH tidal testing site on the Garonne river, Bordeaux, France.

1 minutes read

The video shows the construction of the power substation for the SEENEOH tidal testing site on the Garonne river, Bordeaux, France.

SEENEOH is a tidal testing site on the Garonne river that comprises three test berths, located at depths greater than 8 m, and designed to accommodate tidal devices with mounted or floating fixation type.

Each testing berth is connected to the onshore substation through an export cable, with a grid connection that has a total capacity of 250 kW.

The site is located upstream Garonne river where the tidal range during spring tides exceeds 5 m and current velocity reaches up to 3.5 m/s, while currents above 1 m/s occur approximately 80% of the time, according to SEENEOH.

The test site is operated by Énergie de la Lune – an engineering firm specializing in marine renewable energy and ocean engineering, and it is expected to be fully operation in 2016.

[mappress mapid=”873″]

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.