Advertisement

Green Marine

about 21 years ago

Dredging up a future: The bay deepening project five years later

Five years after Humboldt Bay was dredged to handle deep-draft ships, less port traffic passes through the entrance than in the decades before the project. The U.S. Army Corps of Engineers project to deepen the entrance to 48 feet and the shipping channel to 38 feet is no longer accommodating deep-d

1 minutes read

Five years after Humboldt Bay was dredged to handle deep-draft ships, less port traffic passes through the entrance than in the decades before the project. The U.S. Army Corps of Engineers project to deepen the entrance to 48 feet and the shipping channel to 38 feet is no longer accommodating deep-draft ships on a regular basis, as the Samoa pulp mill has switched to trucks to move its product.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.