Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PSA Norway Carries Out Audit on Songa Dee Rig
Fossil Energy

July 13, 2011 · about 15 years ago

PSA Norway Carries Out Audit on Songa Dee Rig

On 22 September 2010, the Petroleum Safety Authority Norway (PSA) carried out an audit of logistics, cranes, lifting appliances, lifting equipment and structural safety on board the Songa Dee mobile facility. Introduction The verifications targeted technical and operational factors on board the faci

1 minutes read
  • LinkedIn
  • X
  • Email

On 22 September 2010, the Petroleum Safety Authority Norway (PSA) carried out an audit of logistics, cranes, lifting appliances, lifting equipment and structural safety on board the Songa Dee mobile facility.

Introduction

The verifications targeted technical and operational factors on board the facility. The activity is part of the follow-up in connection with the Songa Dee facility’s AoC.

Background

Songa Dee is a mobile drilling facility owned and operated by Songa. The facility has an AoC, and the precondition for maintaining an AoC is that the operator must at all times be able to demonstrate that the facility complies with applicable statutes and regulations.

Objective

The objective of the audit activity was to verify compliance with applicable requirements in statutes and regulations, and how statutes and regulations have been followed up after the facility received the AoC. Furthermore, the objective was to follow-up repairs and modifications, particularly the installation of a new offshore crane.

Results

Nonconformities and improvement items were identified during the audit, mainly associated with:

The management system and implementation of management system and procedures

Several of the identified factors had previously been identified and discussed in the PSA’s audit report dated 22 May 2009.

[mappress] Source:Ptil , July 13, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free