Advertisement

Green Marine

about 15 years ago

Vietnam Takes Delivery of Project Gepard – 3.9 Built by Zelenodolsk Shipyard

Second ship of Project Gepard-3.9 built by Zelenodolsk Shipyard (developed by JSC Zelenodolsk Design Bureau) was delivered to Cam Ranh naval base (Vietnam) on July 25. When all sea and acceptance trials were finished and all weapons and life support systems were tested, the ship was embarked on a sp

1 minutes read

Second ship of Project Gepard-3.9 built by Zelenodolsk Shipyard (developed by JSC Zelenodolsk Design Bureau) was delivered to Cam Ranh naval base (Vietnam) on July 25.

When all sea and acceptance trials were finished and all weapons and life support systems were tested, the ship was embarked on a special transport vessel Eide Transporter and left for Vietnam.

Meeting desires of the orderer after receiving of the first frigate, interior design of the second one was improved. As for experts, the second ship is more serviceable and operable; all systems, mechanisms and arms meet contract specifications and technical design. The frigate was recognized a reference ship of 2011.

[mappress]

Source: rusnavy, August 11, 2011; Image:zdship

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.