Advertisement

Green Marine

about 15 years ago

Vietnam: HVS Holds Steel Cutting Ceremony for Hull No. S048

As scheduled, on 25 August 2011, at 10:00 am, Steel cutting Ceremony for the Hull No. S048 -56,000 DWT Bulk Carrier- has been hosted at HVS fabrication shop. S048 is the third vessel in the series of the eight contracted with Geden (Turkey). Just like her 2 elder sisters, she is 182.5 meter in lengt

1 minutes read

As scheduled, on 25 August 2011, at 10:00 am, Steel cutting Ceremony for the Hull No. S048 -56,000 DWT Bulk Carrier- has been hosted at HVS fabrication shop. S048 is the third vessel in the series of the eight contracted with Geden (Turkey). Just like her 2 elder sisters, she is 182.5 meter in length, 32.26 meter in breadth and 18.3 meter in depth.

In the connection with our current production plan, the captioned vessel shall be launched in the middle of next year and delivered at the end of July 2012.

To be present at the ceremony, representatives of Owner, Class society (DNV) and the Yard gathered to have a short friendly conversation as well as took commemorative photos.

[mappress]

Source: hyundai-vinashin, August 26, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.