Advertisement

Green Marine

about 14 years ago

UAE: FPSO BW Athena Leaves DryDocks World Dubai

Ithaca Energy Inc. revealed that the ‘BW Athena’ Floating Production, Storage and Offloading Vessel (“FPSO”) has departed Dubai Dry Docks World to be met by a dedicated guard vessel. All FPSO production critical equipment was run and fully tested prior to vessel departure thus minimizing the period

1 minutes read

Ithaca Energy Inc. revealed that the ‘BW Athena’ Floating Production, Storage and Offloading Vessel (“FPSO”) has departed Dubai Dry Docks World to be met by a dedicated guard vessel.

All FPSO production critical equipment was run and fully tested prior to vessel departure thus minimizing the period between arrival in the field and first production of oil.

Upon arrival in the field the BW Athena will be hooked up to the pre-installed production system. Hook-up will mark completion of the development phase and the Company anticipates that the production phase will commence in early Q2 2012. Production is anticipated to reach approximately 22,000 (1) barrels of oil per day (“bopd”), approx. 5,000 bopd (net to Ithaca).

[mappress]

Shipbuilding Tribune Staff, March 1, 2012; Image: ithacaenergy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.