Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Pronomar Completes Another Deal for Boskalis (The Netherlands)
Dredging

March 19, 2012 · about 14 years ago

Pronomar Completes Another Deal for Boskalis (The Netherlands)

Pronomar has announced another cooperation with Royal Boskalis Westminster NV, this time regarding the placement of a MERUS ring (for technical water) on the MV Willem van Oranje, a trailing suction hopper dredger. Royal Boskalis Westminster NV is a leading international service company in the marit

2 minutes read
  • LinkedIn
  • X
  • Email

Pronomar has announced another cooperation with Royal Boskalis Westminster NV, this time regarding the placement of a MERUS ring (for technical water) on the MV Willem van Oranje, a trailing suction hopper dredger.

Royal Boskalis Westminster NV is a leading international service company in the maritime sectors. They deliver innovative solutions for infrastructure challenges (in maritime and coastal areas). Her Majesty the Queen named and launched the Willem van Oranje in February 2010, after the founder of the House of Oranje Nassau, William of Orange (Willem van Oranje).

Sustainability was a major focus for the design of the Willem van Oranje. E.g. the ballast water is cleaned before it is pumped overboard. Also space has been left in the funnel where equipment can be installed for the additional cleaning of exhaust fumes. The Willem van Oranje is anticipating the increasingly stricter environmental standards and probably therefore chose for the MERUS ring, which counteracts scaling and preserves the equipment in an environment-friendly manner.

How do the MERUS rings work?

After the installation the rings give off tiny oscillations which then disturb the scaling-process. Very soon afterwards the troublesome substances can be simply flushed away, leaving the equipment, in this particular case the equipment of the Willem van Oranje, free from scaling or any other harmful build-up. The MERUS rings do not require any maintenance, which in return means crucial savings in time and costs.

[mappress]

Dredging Today Staff, March 19, 2012; Image: pronomar

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free