Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Hertel: Moulded PIR Insulation Makes Installation More Cost Effective (The Netherlands)
Clean Fuel

October 8, 2012 · about 14 years ago

Hertel: Moulded PIR Insulation Makes Installation More Cost Effective (The Netherlands)

A new moulded PIR pipeline cryogenic insulation whose performance qualities mean that fewer contraction joints are needed is now available from Hertel, the specialist installers of LNG insulation. Cetrafoam is a 50 kg/m3 rigid, closed cell foam, which is formulated to operate from 120c to -200c, has

2 minutes read
  • LinkedIn
  • X
  • Email

A new moulded PIR pipeline cryogenic insulation whose performance qualities mean that fewer contraction joints are needed is now available from Hertel, the specialist installers of LNG insulation.

Cetrafoam is a 50 kg/m3 rigid, closed cell foam, which is formulated to operate from 120c to -200c, has been designed with a low tensile modulus which makes it more flexible. This gives the foam the mechanical characteristic of being similar to steel and so reduces the need for pipeline expansion and contraction joints.

The moulded foam is also easier to install than traditional block foam and is ideal for off-site preparation, which contributes to better on-site conditions during installation or replacement.

Allan Hollington, who leads Hertel’s Centre of Competence , says: “Cetrafoam is pre-formed in sections, tubes and joints which makes it easier to handle. During its installation, which can be done off-site, no dust is created and there is zero cutting waste that normally comes from using block insulation.”

The moulded foam, which includes a vapour barrier and sub-surface fibre mesh reinforcing, is formed with an ultra-high overpack method which gives it consistency in microcell size and shape. This provides a uniform density and identical mechanical and thermal properties both parallel and perpendicular to the direction of the rise.

It is available in pipe sizes from ½” nps to 24” nps with insulation thickness up to 250mm, or a maximum outside diameter of 1,100mm. Cetrafoam was developed by Cetra Technologies Pty Ltd and is licensed to Matrix Composites & Engineering Ltd who carry-out a continuous process of research and development to keep ahead of industry trends and client demands.

Allan Hollington adds: “The moulded pipe sections produce negligible waste whereas cutting using traditional block insulation can mean up to 50 per cent waste on each LNG train so making it more cost effective.”

“The ability to use Cetrafoam makes installing insulation easier. It is also more cost-effective and without the need for contraction joints means greater integrity in the train for better performance.”

[mappress] LNG World News Staff, October 08, 2012; Image: Hertel

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free