Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Carbon Trust to Conduct Offshore Wind Cable Study (UK)
Subsea

November 12, 2012 · about 14 years ago

Carbon Trust to Conduct Offshore Wind Cable Study (UK)

Carbon Trust is planning to conduct the offshore wind cable study. A significant number of UK offshore wind farms have experienced difficulties associated with the installation and burial of intra-array cables. In 2011, the OWA commissioned a study to develop recommendations for optimised cable inst

2 minutes read
  • LinkedIn
  • X
  • Email

Carbon Trust is planning to conduct the offshore wind cable study.

A significant number of UK offshore wind farms have experienced difficulties associated with the installation and burial of intra-array cables. In 2011, the OWA commissioned a study to develop recommendations for optimised cable installation methodologies that could be applied to large wind farms such as the UK Round 3 developments. As a novel alternative to J-tubes, it was recommended that the feasibility and benefits of a cabling design involving free-hanging cables attached to the turbine platform be explored. The cables (dynamic or static cables) would therefore have to be designed for dynamic conditions. This novel alternative is a potential solution to reduce installation cost and has been used in Oil and Gas applications.

The cable would be connected to the platform and would be left free-hanging to the seabed, requiring use of dynamic cable designs. Cable suppliers have already confirmed the feasibility of such a cable design and the OWA Cables Technical Working Group would like to better understand the benefits.

The objectives of this study are to:

– Examine the limits, benefits and risks of using free-hanging cables to connect offshore wind turbines;

– Consider the feasibility of static cables in dynamic environments (typical of subsea conditions) and design changes that may be required to make this possible;

– Evaluate the technological, engineering and supply chain risks;

– Identify potential mitigation strategies;

– Provide a detailed assessment of the construction, installation, HSE and operation and maintenance;

– Understand fatigue and mechanical strain;

– Determine the capital and operating cost implications and any potential impact on schedule.

[mappress] Subsea World News Staff , November 12, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free