The launch of the head multifunction complex port service vessel based under the project PELLA SKPO-1000 has been carried out at the Pella Shipyard.
For the first time the vessel of more than 50 m length is launched in the existing slipway because of the unique transport-launching appliance using the “sliding” pull rods for the rapprochement of trolleys at pivoting of the vessel.
Assignment:
Bunkerage of the vessels with different types of fuel
Collection of oily content, sewage, bilge waters from vessels and floating objects
Collection of dry garbage and food waste from vessels
Buoys transportation and placement
Beaconage floating devices maintenance
Oil spill removal
Transportation of cargoes
Technical information:
Length max 49,9 m
Width max 14,0 m
Depth ab. 5,0 m
Speed ab. 10,0 knots
Classification КМ Ice3 R2 Aut1 Oil Tanker (>60° C) ESP by Russian Maritime Register of shipping.
Propulsion system ВРК US 155, Rolls-Royce, FPP into nozzles
Powerplant 2х970 kW at 1800 r/min, Caterpillar С32
Bow thruster tunnel type, TAC 75, ABS, providing the power of 75 kW
[mappress]
Press Release, December 26, 2012