Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›STATS Isolates BP’s Oil Export Line in UK North Sea
Fossil Energy

March 22, 2013 · about 13 years ago

STATS Isolates BP’s Oil Export Line in UK North Sea

STATS Group, an Aberdeen-based company specialising in piping and pipeline integrity and maintenance, has successfully isolated a 24″ oil export line on BP’s Marnock ETAP spur line located in the Central North Sea to allow the replacement of a 16” valve. STATS deployed its 24” Remote Tecno Plug to i

1 minutes read
  • LinkedIn
  • X
  • Email

STATS Group, an Aberdeen-based company specialising in piping and pipeline integrity and maintenance, has successfully isolated a 24″ oil export line on BP’s Marnock ETAP spur line located in the Central North Sea to allow the replacement of a 16” valve.

STATS deployed its 24” Remote Tecno Plug to isolate a pressure of 60 Bar providing safe working conditions to allow valve replacement activities. Once set the primary and secondary seal tests were carried out using full isolation pressure.

The pressure between the primary and secondary seals was monitored throughout the isolation, ensuring safety critical double block isolation. With the valve replaced and Tecno Plug continuing to maintain isolation, a 24” extended body in-line weld test tool was installed through the launcher to straddle the 16” tee. The test tool was then set to carry out the reinstatement and leak test of the 16” branch and valve.

A flexibility on lead time to meet planned platform shutdown dates was imperative and STATS mobilised and completed the work scope in a seven week time frame, including a factory acceptance test in a purpose-built test fixture.

STATS Group isolation services manager, Steven Byers , said: “The project was a success and enabled BP to complete maintenance works which were reliant on the plug providing an isolation. The client was happy with our flexible approach and willingness to interact to achieve the best outcome possible during a time critical window.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EU grant to cover 60% of investment for 10 MW tidal kite array in Ireland
  2. 2Eni and Libya’s National Oil Corporation turning on the taps at African gas project
  3. 3Transocean’s drillship pair bags $550 million in new US Gulf deals
  4. 4Fugro completes 2026 survey campaign for Ireland’s 900 MW offshore wind project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free