Green Marine

about 13 years ago

Chengxi Cuts Steel for Two Container Ships

On the morning of August 5, the steel cutting ceremony of conversion project for container ships “CONDOR” and “CORSAR” was grandly held in Hull Workshop of Xinrong Shipyard. The vessels of the “CONDOR” and “CORSAR” , with the construction periods of 36 days and 33 days, is to enter the yard in about

1 minutes read

On the morning of August 5, the steel cutting ceremony of conversion project for container ships “CONDOR” and “CORSAR” was grandly held in Hull Workshop of Xinrong Shipyard.

The vessels of the “CONDOR” and “CORSAR” , with the construction periods of 36 days and 33 days, is to enter the yard in about October and November for lengthening conversion. The project of the 880TEU containership “CONDOR” (140.73 M in LOA, 23.2 M in breadth, and 11.51 M in depth), includes the installation of a new mega block about 420 tons and 17 meters in the cargo hold area, which updates the ship to be 1025 TEU, new building of the main deck hatch cover (oil cylinder type), the extension work for the machanical & electrical systems, as well as cables connections.

As the first cooperation between Xinrong Shipyard and Winter Reederei GmbH & Co KG, the conversion projects for both vessels are expected to be successfully completed, and to pave way for further cooperations.

[mappress] Press Release, August 21, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.