Advertisement

Green Marine

about 13 years ago

NEVA-LEADER 5 Sets Sail on Builder’s Sea Trials, Russia

On August 31st, 2013 the dwt 7150 tonne vessel, NEVA-LEADER 5 set off on builder’s sea trials. The self-propelled dry-cargo vessel, NEVA-LEADER 5 (yard number 405) is being built at Nevsky Shipyard for North -Western Shipping Company, JSC. The project RSD49 is developed by Marine Engineering Bureau-

1 minutes read

On August 31st, 2013 the dwt 7150 tonne vessel, NEVA-LEADER 5 set off on builder’s sea trials. The self-propelled dry-cargo vessel, NEVA-LEADER 5 (yard number 405) is being built at Nevsky Shipyard for North -Western Shipping Company, JSC.

The project RSD49 is developed by Marine Engineering Bureau-Design-SPb, JSC.

The distinct feature of the vessel (compared to all other projects of Volgo-Don Max class) is the existence of a large middle hold in fifty-two meters of length, which makes it possible to transport “design” oversize and heavy-lift cargoes in one-way voyage from Europe to the Caspian Sea.

It has significant affects on cumulative financial result.

[mappress] Press Release, September 2, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.