Advertisement

Green Marine

about 13 years ago

Refitted Linden Pride Departs Chengxi

On September 15, the second LPG Vessel from NYK Ship Management Pte. Ltd. “Linden Pride” departed Chengxi shipyard after successful repair. Previously, Chengxi repaired “Gas Aries” another LPG vessel of the same owner. “Linden Pride” arrived at the berth No.6 of Chengxi on August 30. As scheduled, c

1 minutes read

On September 15, the second LPG Vessel from NYK Ship Management Pte. Ltd. “Linden Pride” departed Chengxi shipyard after successful repair.

Previously, Chengxi repaired “Gas Aries” another LPG vessel of the same owner.

“Linden Pride” arrived at the berth No.6 of Chengxi on August 30. As scheduled, considerable mechanical and electrical repair along with blasting work of eight passages was to ensue within the 18 following days.

Building on the experience with the repair of M/V Gas Aries in terms of quality control as well as equipment protection, the Ship Repair Division managed to compete the M/E repair, mechanical & electrical work, sand blasting and coating work as well as pipe-replacement.

[mappress] Press Release, September 19, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.