The State Commission and Pella shipyard have signed the Acceptance and Delivery Act for the tugboat “MB-93” (building No 504).
In November the tugboat will be put into operation within RF Pacific Fleet.
Assignment:
Deck equipment:
In order to fulfill fire-fighting operations the tugboat is equipped with external fire fighting system made by FFS (capacity is 1500 m3/h, 2 water monitors, water curtains system).
[mappress]
Press Release, September 26, 2013