Advertisement

Green Marine

about 13 years ago

Navis Completes Contract for Superyacht ‘Madame Gu’

Navis Engineering has successfully concluded a contract from Alpahtron Marine to supply a dynamic positioning (DP) system to the largest superyacht to be constructed in The Netherlands, the 99m Madame Gu. Built at Feadship in steel and aluminium over the course of a four-year period, the superyacht

1 minutes read

Navis Engineering has successfully concluded a contract from Alpahtron Marine to supply a dynamic positioning (DP) system to the largest superyacht to be constructed in The Netherlands, the 99m Madame Gu.

Built at Feadship in steel and aluminium over the course of a four-year period, the superyacht is powered by four MTU 20v diesel engines and can reach a maximum speed of 24 knots. It has a beam of 13.6m, a maximum draught of 4.6m, is classed by Lloyd’s Register and is MCA compliant.

Madame Gu‘s particular features include accommodation for up to 12 guests in six state rooms including a master state room and five guest cabins. The vessel also carries a crew of 36, sleeping in 18 crew cabins. Special amenities include a fully enclosed helicopter hangar, two 11m yacht tenders and scuba gear.

Madame Gu has a beam of 13.6m and a maximum draught of 4.6m. Classed by Lloyd’s Register, the vessel is MCA compliant.

[mappress]

Press Release, October 8, 2013

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.