Advertisement

Green Marine

about 12 years ago

ULJANIK to Build Two MRs for MARFLET

Spain-based MARFLET has ordered two new product carriers from Croatian ULJANIK shipyard. The contract for the construction of two MR vessels was signed yesterday in Madrid, Spain. The vessels will have a deadweight of 50,000 tonnes and will be 183 metres long and 32.20 metres wide. These IMO II type

1 minutes read

Spain-based MARFLET has ordered two new product carriers from Croatian ULJANIK shipyard.

The contract for the construction of two MR vessels was signed yesterday in Madrid, Spain. The vessels will have a deadweight of 50,000 tonnes and will be 183 metres long and 32.20 metres wide.

These IMO II type chemical tankers will be built by Uljanik’s subsidiary 3. Maj. The first one is scheduled for delivery by the end of 2015 and the second in 2016.

MARFLET already has five similar double-hulled vessels in its fleet, all built at Uljanik and classed by the Lloyd’s Register.

[mappress] SBT Staff, January 17, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.