Advertisement

Dredging

about 12 years ago

Picture of the Day: Fall Pipe & Mining Vessel Joseph Plateau

Joseph Plateau was launched in 2012 at the Spanish shipyard Construcciones Navales de Norte in Sestao. This 191,5 m long vessel is used for precise rock dumping to a depth of 2,000 m. The system for the unfolding of the fall pipe is extremely advanced and operates fully automatically. At the bottom

1 minutes read

Joseph Plateau was launched in 2012 at the Spanish shipyard Construcciones Navales de Norte in Sestao.

This 191,5 m long vessel is used for precise rock dumping to a depth of 2,000 m.

The system for the unfolding of the fall pipe is extremely advanced and operates fully automatically.

At the bottom of the fall pipe there is a ROV (Remote Operated Vehicle) that accurately corrects the position of the lower end of the fall pipe.

The vessel has a 31,500 ton loading capacity and makes it possible to dump 2,000 tons of rock per hour at a depth of 2,000 m.

The vessel can accomodate 84 persons.

Advertisement

Dredging Today Staff, June 4, 2014; Image Jan de Nul

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.