Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›JND Thomas Gets Ready for Machado Lake Dredging
Dredging

June 23, 2014 · about 12 years ago

JND Thomas Gets Ready for Machado Lake Dredging

JND Thomas Company, Inc., Riverdale, CA the major sub contractor with OHL,USA, Inc., to perform the dredging and mechanical dewatering activities, is currently mobilizing onto Machado Lake, Harbor City, CA. The scope of the work for the project includes removal and mechanical dewatering of approxima

1 minutes read
  • LinkedIn
  • X
  • Email

JND Thomas Company, Inc., Riverdale, CA the major sub contractor with OHL,USA, Inc., to perform the dredging and mechanical dewatering activities, is currently mobilizing onto Machado Lake, Harbor City, CA.

The scope of the work for the project includes removal and mechanical dewatering of approximately 239,000 cubic yards of lake sediment. Sediment removal, removal of accumulated materials from the bottom of lakes, rivers, harbors and other water bodies, is necessary because of the natural process of sedimentation due to erosion, urban runoff, and organic decay.

In this case, Machado Lake’s water depth has been significantly decreased due to sediment build-up over several decades. Removing the sediment will increase the lake capacity to handle storm flows, ameliorate eutrophic conditions, and control the growth of nuisance aquatic plant species.

For the project, JND Thomas will be utilizing its proprietary portable mechanical dewatering plant which has the smallest footprint within the industry. The saturated dredged sediment will be dewatered using geotextile dewatering tubes or other mechanical dewatering process within designated laydown areas and returned to the lake. The return water will be tested and treated prior to being discharged back into the lake.

Sediment removal will occur throughout the lake with specific focus on the northern and southern portions of the lake.

[mappress]

June 23, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1CO2 storage appraisal campaign in UK North Sea yields positive results
  2. 2MOL and Deutsche ReGas shake hands on FSRU for German LNG terminal
  3. 3Egypt’s energy infrastructure grows as two new offshore platforms slide into place
  4. 4Seaway7 completes inter-array cable installation at East Anglia Three offshore wind farm

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free