Advertisement

Green Marine

about 12 years ago

Navis NavDP 4000 Installed on Mein Schiff 3

Recently completed sea trials by the 99,430 gross tons cruise ship Mein Schiff 3 have confirmed the high performance of Navis Engineering’s dynamic positioning (DP) control system, Navis Nav DP4000. Designed and constructed for TUI Cruises by STX Shipyard in Turku, Finland and delivered in May this

1 minutes read

Recently completed sea trials by the 99,430 gross tons cruise ship Mein Schiff 3 have confirmed the high performance of Navis Engineering’s dynamic positioning (DP) control system, Navis Nav DP4000.

Designed and constructed for TUI Cruises by STX Shipyard in Turku, Finland and delivered in May this year, the 294m long and 36m wide Mein Schiff 3 is a sophisticated and highly innovative cruise ship operating in the German premium class cruise market.

The vessel incorporates a number of eco-friendly features, with particular emphasis on energy efficiency. This means Mein Schiff 3 consumes around 30% less energy compared with cruise ships of similar sizes.

The Mein Schiff 3 DP control system was designed in close cooperation with TUI Cruises. It features special functions which contribute to substantial fuel reduction, particularly during tendering operations.

[mappress] Press Release, June 26, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.