Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›EPA Extends Comment Period for Housatonic Cleanup
Dredging

September 16, 2014 · about 12 years ago

EPA Extends Comment Period for Housatonic Cleanup

EPA is extending the comment period on its Draft Modification to General Electric’s Reissued RCRA Permit (also referred to as the Proposed Cleanup Plan for the Housatonic River Rest of River). In response to several requests for extension, public comments on the Draft Permit will be accepted through

1 minutes read
  • LinkedIn
  • X
  • Email

EPA is extending the comment period on its Draft Modification to General Electric’s Reissued RCRA Permit (also referred to as the Proposed Cleanup Plan for the Housatonic River Rest of River).

In response to several requests for extension, public comments on the Draft Permit will be accepted through Oct. 27, 2014. EPA will also hold a public hearing on the Draft Modification to the RCRA Permit on Sept. 23 at 6:30 p.m. at Lenox Memorial Middle and High School (Duffin Theater).

The Draft Modification to the RCRA Permit sets forth EPA’s Proposed Remedial Action and Operation and Maintenance requirements for the Rest of River. The Rest of River begins at the confluence of the East and West branches of the Housatonic River in Pittsfield, Massachusetts and extends into Connecticut.

At the end of May, EPA released its Statement of Basis for EPA’s Proposed Remedial Action for the Housatonic River “Rest of River” and the associated Draft Modification to the RCRA Permit. Public Informational meetings were held on June 18 in Lenox, Massachusetts and June 24 in Kent, Connecticut. EPA initiated the formal public comment period on the Draft Permit Modification on June 25, 2014.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free