Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›ABB electrical system ordered for Petronas’ second FLNG
Clean Fuel

February 5, 2015 · about 11 years ago

ABB electrical system ordered for Petronas’ second FLNG

ABB said it has won a contract worth more than $50 million to supply the electrical system for one of the world’s first commercial FLNG facilities, and the second to be owned by Malaysian oil and gas company Petronas.

2 minutes read
  • LinkedIn
  • X
  • Email

ABB said it has won a contract worth more than $50 million to supply the electrical system for one of the world’s first commercial FLNG facilities, and the second to be owned by Malaysian oil and gas company Petronas.

It will be called PFLNG2 and the contract was awarded in the fourth quarter of 2014 by Japanese engineering contractor JGC Corporation. JGC is part of a consortium that is building the facility for Petronas, along with Samsung Heavy Industries of Korea.

Under the terms of the contract, ABB will support the optimization of the facility’s electrical side by designing, manufacturing and supplying transformers, switchboards, motor control centers and power management system. In addition, ABB will also manage the installation of the equipment and ensure the electrical supply is integrated with systems it is powering, the company said in a statement.

FLNGs have long been considered an attractive concept, and a recent report by Douglas-Westwood estimated the market to be worth $64 billion between now and 2020. The agility of FLNGs allows oil and gas companies to exploit fields that would otherwise be uneconomical, and their environmental impact is minimal compared with conventional production platforms and pipelines.

The PFLNG2 will be built at Samsung Heavy Industries’ yard in Geoje, Korea in 2015. When operations start in 2018, the facility will be moored over the deepwater Rotan gas field located off the Malaysian coast.

It is designed to produce 1.5 million tons of LNG annually for at least 20 years before it requires a dry dock.

[mappress mapid=”16631″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelEquipmentProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free