Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›Qatargas Launches USD 1 Billion Eco Project at Ras Laffan
Green Marine

April 30, 2015 · about 11 years ago

Qatargas Launches USD 1 Billion Eco Project at Ras Laffan

The world’s largest LNG producer Qatargas has officially inaugurated the Jetty Boil-Off Gas Recovery (JBOG) Project to recover the gas flared during Liquefied Natural Gas (LNG) loading at the six LNG berths in Ras Laffan Port. The JBOG Project will result in a 90% reduction in flaring at the six LNG

1 minutes read
  • LinkedIn
  • X
  • Email

The world’s largest LNG producer Qatargas has officially inaugurated the Jetty Boil-Off Gas Recovery (JBOG) Project to recover the gas flared during Liquefied Natural Gas (LNG) loading at the six LNG berths in Ras Laffan Port.

The JBOG Project will result in a 90% reduction in flaring at the six LNG loading berths at Ras Laffan, equivalent to annual Green House Gas (GHG) savings of 1.6 million tonnes of CO2.

The project will help recover 29 billion standard cubic feet (bscf) of gas per year which is enough gas to produce 750 MW of power or to power 300,000 homes.

The JBOG Project is part of the Common Facilities Projects at RLIC and it is led and operated by Qatargas on behalf of Qatar Petroleum and RasGas Company Limited (RasGas).

Saad Sherida Al-Kaabi, President and CEO of Qatar Petroleum and Chairman of Qatargas, said the JBOG Project is not only the biggest environmental project in the world, but also one of the largest investments of its kind, at nearly one billion dollars.

Ras Laffan is the world’s largest LNG export terminal and the only facility where multiple LNG ships can be loaded simultaneously. JBOG had to be designed to recover the boil off gas from multiple ships loading simultaneously.

Since the start of the first recovery of jetty boil-off gas in October 2014, jetty boil-off gas has been recovered from over 500 ships.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell, GTT, and Lloyd’s Register eye hybrid-electric LNG carrier design
  2. 2Equinor to feed Dutch grid with low-emission Norwegian gas through 2031
  3. 3BW Energy locks down multimillion-dollar financing for offshore platform and production growth
  4. 4Tidal energy array in Scotland cleared for construction start

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free