Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›BlueTEC Prepares to Install Second Tidal Turbine
Offshore Wind

October 13, 2015 · about 11 years ago

BlueTEC Prepares to Install Second Tidal Turbine

The BlueTEC Texel Tidal partnership is now planning the installation of a second, larger turbine following the successful first months of operating the BlueTEC tidal energy platform. “Getting the platform from the drawing board to a grid-connected operating reality in just 6 months is amazing,” says

2 minutes read
  • LinkedIn
  • X
  • Email

The BlueTEC Texel Tidal partnership is now planning the installation of a second, larger turbine following the successful first months of operating the BlueTEC tidal energy platform.

“Getting the platform from the drawing board to a grid-connected operating reality in just 6 months is amazing,” says Allard van Hoeken, Head of New Energy at Bluewater Energy Services and recent recipient of the first Prince Friso Engineers Award. “The electricity production is conform expectations, the mooring loads are lower than expected and the stability is better than expected. It is a great success.”

Shortly after its launch this summer the platform’s new moorings passed their first serious tests with flying colours as two large storms passed over the area.

With the platform up and running smoothly, the project partners are now looking forward to the next step in its development.

“We will install the next turbine – a Tocardo T2 – before the winter. This will double the platform’s capacity,” says Mr Van Hoeken . “A few months after that we will install a second T2 turbine. With two turbines working simultaneously this will double the capacity once again to reach the 400-500 kW mark. This means a proven solution is available on the market. In the meantime we will proceed to even larger units of 2.5 MW each.”

“These units can supply clean energy to islands and remote locations below the cost of diesel generators. In addition, what the industry may only be starting to realise, is that they also pave the way towards large, utility-scale tidal farms. Starting with 500 kW units means using existing technology and a small grid setup, hence keeping the required investment and associated risks to a minimum. In the following step, our 2.5 MW units will be used for full development,” he says.

The BlueTEC platform serves as a demonstrator model. “It has been very easy to solve any issues we came across,” informs Mr Van Hoeken . “We can reach the platform with a small boat, open the watertight door and enter the electronics room, fix and replace something and be back on land an hour later.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fatal rig incident: Search still underway for two missing workers off Gabon
  2. 2Planned wave energy project in India takes step forward
  3. 3CO2 storage appraisal campaign in UK North Sea yields positive results
  4. 4MOL and Deutsche ReGas shake hands on FSRU for German LNG terminal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free