Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Water Injection Dredger Borr Starts Parrett River Dredging
Dredging

November 15, 2016 · about 10 years ago

Water Injection Dredger Borr Starts Parrett River Dredging

New techniques for dredging the Parrett are being tested this November and December, as Somerset Rivers Authority seeks cheaper and better ways of maintaining tidal rivers. Three weeks of trials are being carried out between Westonzoyland Pumping Station and Burrowbridge to see how effective water i

1 minutes read
  • LinkedIn
  • X
  • Email

New techniques for dredging the Parrett are being tested this November and December, as Somerset Rivers Authority seeks cheaper and better ways of maintaining tidal rivers.

Three weeks of trials are being carried out between Westonzoyland Pumping Station and Burrowbridge to see how effective water injection dredging and agitation dredging can be at getting silt moving down to Bridgwater Bay and preserving the River Parrett’s capacity.

Cllr John Osman, SRA chairman , said: “ This is the first time that such trials have been done on the Parrett in conjunction with a long-term program of detailed monitoring. Potentially, new methods offer Somerset big benefits: done at the right times, in the right places, they could be much cheaper, more effective, and better for the environment, local residents and farmers. ”

The trials are being delivered for the SRA by the Parrett Internal Drainage Board with contractors Van Oord.

The vessel being used for the Parrett project is water injection dredger Borr. After being delivered to Dunball Wharf in halves, then re-assembled, Borr motored upstream through Bridgwater on Saturday night, 12 November.

Three weeks of trials started on Monday, 14 November.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free