Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Aberystwyth Marina Scheme Wrapped Up
Dredging

December 16, 2016 · about 9 years ago

Aberystwyth Marina Scheme Wrapped Up

The Marine Group has announced that the reconfiguration of the layout at Aberystwyth Marina is now complete. Walcon Marine has been on site for the past 3 weeks, carrying out an extensive program of works to significantly improve the marina layout. Several new pontoons have been installed and others

1 minutes read
  • LinkedIn
  • X
  • Email

The Marine Group has announced that the reconfiguration of the layout at Aberystwyth Marina is now complete.

Walcon Marine has been on site for the past 3 weeks, carrying out an extensive program of works to significantly improve the marina layout.

Several new pontoons have been installed and others have been repositioned to considerably upgrade the access and design of the marina.

The new layout has increased the overall number of berths available and created a number of larger berths.

This is the latest stage of an ongoing development program, designed to improve the infrastructure of the marina, which began when the marina was purchased by The Marine Group in September 2015.

In addition, the marina has recently benefited from dredging and upgraded security systems.

The Marine Group recently increased their marine service offering with the purchase of a water injection dredger.

The vessel is particularly versatile and is capable of dredging in areas out of reach of many larger dredgers, the comapny said.

The purchase of the dredger is part of the company’s ongoing program of investment, which has recently seen the company expand the size of their boatyard and invest in a sealift for lifting boats up to 50 tonnes.

[mappress mapid=”23379″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free