Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›DEME Group: Steel Cutting for CSD SPARTACUS at Royal IHC
Dredging

September 6, 2017 · about 9 years ago

DEME Group: Steel Cutting for CSD SPARTACUS at Royal IHC

The steel cutting ceremony for the new 44,180kW self-propelled cutter suction dredger (CSD) SPARTACUS took place today, DEME Group said in its latest announcement. CSD SPARTACUS, which will be built by Royal IHC, will be the world’s first LNG-powered cutter suction dredger and follows the order of t

1 minutes read
  • LinkedIn
  • X
  • Email

The steel cutting ceremony for the new 44,180kW self-propelled cutter suction dredger (CSD) SPARTACUS took place today, DEME Group said in its latest announcement.

CSD SPARTACUS, which will be built by Royal IHC, will be the world’s first LNG-powered cutter suction dredger and follows the order of the first LNG-powered Trailing Suction Hopper Dredgers ‘Minerva’ and ‘Scheldt River’.

The concept and basic design for this 164 meters long mega cutter was done in close cooperation with DEME, Vuyk Engineering Rotterdam and IHC.

“This cutter suction dredger is going to be an important benchmark for the industry and a huge step toward limiting the environmental impact of our vessels,” said DEME’s Head of Construction and Conversion, Jan Gabriel.

“ We can state that this CSD is the largest and most complex that IHC has ever built ,” commented IHC’s CEO Dave Vander Heyde . “ The combination of power, size and innovations makes it a true challenge to build. We are proud and honored that DEME has again placed their trust in us.”

The dredge control is arranged for a one-man operation. Also, the vessel will have a heavy-duty cutter ladder with a dredging depth of 45m.

The new CSD will be delivered in the summer of 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free